GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: TULARE COUNTY

DETERMINATION: TUL-2022-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE STRAIGHT-TIME TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER: BRICKLAYER, CEMENT BLOCKLAYER, POINTER, CAULKER, CLEANER 08/22/2022 04/30/2023** $45.100 A $9.250 $9.480 $0.000 $1.160 B $0.850 8.0 C $65.840 $88.390 D $88.390 D $110.940 HolidaysScope of WorkTravel & Subsistence
#BRICKLAYER: STONEMASON, MARBLE MASON 08/22/2022 04/30/2023** $45.100 A $9.250 $9.480 $0.000 $1.160 B $0.450 8.0 C $65.440 $87.990 D $87.990 D $110.540 HolidaysScope of WorkTravel & Subsistence
#BRICKLAYER: MASON FINISHER 08/22/2022 04/30/2023** $40.590 A $9.250 $9.480 $0.000 $1.110 B $0.450 8.0 C $60.880 $81.180 D $81.180 D $101.470 HolidaysScope of WorkTravel & Subsistence
BRICK TENDER 02/22/2022 03/31/2022* $15.000 & $6.840 $10.130 $0.000 $0.410 $0.000 8.0 $32.380 $39.880 $39.880 $39.880 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, RESILIENT TILE LAYER 08/22/2022 12/31/2022** $37.070 E $10.700 $10.670 $0.000 $0.730 $0.150 8.0 $59.320 $76.150 F $76.150 F $92.980 G HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2022 11/30/2022* $38.240 $12.400 $9.150 H $0.000 $1.100 $0.260 I 8.0 $62.490 $82.280 J $82.280 J $102.060 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2022 11/30/2022* $43.980 $12.400 $9.150 H $0.000 $1.100 $0.260 I 8.0 $68.430 $91.190 J $91.190 J $113.950 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 08/22/2022 02/28/2023** $43.000 $12.550 $11.900 H $0.000 K $1.100 $0.750 8.0 $70.590 $92.740 L $92.740 L $114.880 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2022 02/28/2023** $47.300 $12.550 $11.900 H $0.000 K $1.100 $0.750 8.0 $75.020 $99.380 L $99.380 L $123.740 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY M 02/22/2022 02/28/2023** $52.600 $13.380 $13.010 N $4.900 O $1.260 $0.190 8.0 $85.340 $111.640 P $111.640 P $137.940 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: INSTRUMENTMAN M 02/22/2022 02/28/2023** $49.010 $13.380 $13.010 N $4.900 O $1.260 $0.190 8.0 $81.750 $106.260 P $106.260 P $130.760 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHAINMAN/RODMAN M 02/22/2022 02/28/2023** $46.130 $13.380 $13.010 N $4.900 O $1.260 $0.190 8.0 $78.870 $101.940 P $101.940 P $125.000 HolidaysScope of WorkTravel & Subsistence
GLAZIER 02/22/2022 03/31/2022* $15.000 & $0.000 $0.000 $0.550 $0.000 $0.000 8.0 $15.550 $23.050 $23.050 $23.050 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER Q 08/22/2022 07/31/2023** $39.200 R $11.100 $6.180 $0.000 S $0.450 $0.910 8.0 $57.840 $77.440 T $97.040 $97.040 HolidaysScope of WorkTravel & Subsistence
#PAINTER TAPER 08/22/2022 12/31/2022** $45.100 U $10.700 $16.200 $0.000 $1.050 $0.560 8.0 $73.610 $96.160 V $96.160 V $118.710 W HolidaysScope of WorkTravel & Subsistence
#PAINTER: X 08/22/2022 12/31/2022** $32.260 Y $10.700 $9.350 N $0.000 $0.630 $0.410 8.0 $53.350 $69.480 $69.480 Z $85.610 AA HolidaysScope of WorkTravel & Subsistence
#PAINTER: INDUSTRIAL PAINTER AB 08/22/2022 12/31/2022** $33.760 Y $10.700 $9.350 N $0.000 $0.630 $0.410 8.0 $54.850 $71.730 $71.730 Z $88.610 AA HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRIDGE PAINTER AC 08/22/2022 12/31/2022** $33.760 Y $10.700 $9.350 N $0.000 $0.630 $0.410 8.0 $54.850 $71.730 $71.730 Z $88.610 AA HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2022 06/30/2023** $45.540 AD $14.430 $18.490 $0.000 K $1.290 $1.340 8.0 AE $81.090 $100.760 AF $100.760 AG $120.420 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2022 06/30/2023* $38.020 $9.600 $14.680 $3.470 $0.500 $1.110 AH 8.0 $67.380 $86.390 F $86.390 F $105.400 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2022 12/31/2022** $46.050 $12.880 $23.410 $0.000 K $1.550 $2.770 8.0 $86.660 $109.690 D $109.690 D $132.710 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PIPE TRADESMAN 08/22/2022 12/31/2022* $18.420 $10.430 $1.000 $0.000 K $0.000 $0.710 8.0 $30.560 $39.770 D $39.770 D $48.980 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2022 06/30/2023** $32.220 $12.150 $3.000 AI $2.000 $0.400 $0.800 8.0 $50.570 $66.680 $66.680 Z $82.790 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: LANDSCAPE PIPEFITTER 08/22/2022 06/30/2023** $32.220 $12.150 $3.000 AI $2.000 $0.400 $0.800 8.0 $50.570 $66.680 $66.680 Z $82.790 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AJ 08/22/2022 06/30/2023** $19.220 $12.150 $3.000 AI $2.000 $0.400 $0.800 8.0 $37.570 $47.180 $47.180 Z $56.790 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AK 08/22/2022 06/30/2023** $19.220 $12.150 $3.000 AI $2.000 $0.400 $0.800 8.0 $37.570 $47.180 $47.180 Z $56.790 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AL 08/22/2022 06/30/2023** $16.000 $12.150 $3.000 AI $2.000 $0.400 $0.800 8.0 $34.350 $42.350 $42.350 Z $50.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AM 08/22/2022 06/30/2023** $16.000 $12.150 $0.000 AI $2.000 $0.400 $0.800 8.0 $31.350 $39.350 $39.350 Z $47.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AM 08/22/2022 06/30/2023** $16.000 $12.150 $3.000 AI $2.000 $0.400 $0.800 8.0 $34.350 $42.350 $42.350 Z $50.350 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 02/22/2022 12/31/2022** $40.360 $10.990 $15.180 AN $0.000 $0.520 $0.250 8.0 $67.300 $87.480 $87.480 $107.660 HolidaysScope of WorkTravel & Subsistence
#ROOFER 02/22/2022 12/31/2022** $38.810 AO $6.880 $7.400 $0.000 K $0.470 $0.060 AP 8.0 $53.620 $73.030 $73.030 AQ $92.430 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER METAL DECK & SIDING 08/22/2022 06/30/2023* $47.920 AO $15.000 AI $21.960 AR $0.000 K $0.320 AS $0.000 8.0 $85.200 $110.160 AT $110.160 AT $135.120 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER (HVAC) 02/22/2019 03/31/2019* $38.490 AU $14.130 $20.130 $0.000 $1.390 $0.000 8.0 $74.140 $93.380 $93.380 $93.380 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER (HVAC) METAL DECK & SIDING 02/22/2019 03/31/2019* $39.930 AU $14.380 $18.000 $0.000 $0.320 $0.000 8.0 $72.630 $92.600 $92.600 $92.600 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AV 08/22/2022 06/30/2023** $41.930 AW $11.100 $6.470 $0.000 K $0.800 $1.040 8.0 $61.340 $79.900 AT $79.900 AT $98.450 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AV 08/22/2022 06/30/2023** $56.840 AW $11.100 $14.780 $0.000 K $0.800 $1.280 8.0 $84.800 $110.040 AT $110.040 AT $135.280 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2022 03/31/2023* $28.590 AX $10.960 $4.890 $1.300 $0.460 $1.030 8.0 Z $47.230 $61.530 $61.530 AY $75.820 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2022 03/31/2023** $43.430 AX $10.960 $7.630 $2.350 $0.650 $1.580 8.0 Z $66.600 $88.320 $88.320 AY $110.030 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: 02/22/2022 03/31/2022* $15.000 $0.990 $0.250 $0.460 AZ $0.000 $0.000 8.0 $16.700 $24.200 BA $24.200 BA $31.700 BA HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: PUMP INSTALLER 02/22/2022 03/31/2022* $15.000 $0.990 $0.260 $0.490 BB $0.000 $0.000 8.0 $16.740 $24.240 BA $24.240 BA $31.740 BA HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: HELPER 02/22/2022 03/31/2022* $15.000 $0.990 $0.220 $0.410 BC $0.000 $0.000 8.0 $16.620 $24.120 BA $24.120 BA $31.620 BA HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF AND CONTRACT COMPLIANCE.
B
INCLUDES AN AMOUNT FOR IMI TRAINING FUND.
C
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER, OR REASONS BEYOND THE CONTROL OF THE EMPLOYER.
D
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
E
INCLUDES AMOUNT WITHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED INTO OVERTIME
F
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
G
DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.
H
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
I
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
J
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
K
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
L
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAYS. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY OVERTIME RATE.
M
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
N
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
O
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
P
RATE APPLIES TO DAILY OVERTIME HOURS UP TO AND INCLUDING 12 HOURS WORKED IN A WORKDAY OR OTHER OVERTIME HOURS BEYOND 40 HOURS IN A WORKWEEK. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT THERE ARE LESS THAN 40 HOURS WORKED MONDAY THROUGH FRIDAY, THEN THE BALANCE OF HOURS WORKED UP TO AND INCLUDING 40 HOURS FOR THE WORKWEEK, OR UP TO 8 HOURS FOR THE WORKDAY, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
Q
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
R
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
S
INCLUDED IN BASIC HOURLY RATE.
T
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
U
INCLUDES AN AMOUNT FOR DUES CHECK OFF
V
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
W
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
X
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($1.00 PER HOUR), SPRAY WORK ($1.00 PER HOUR) REMEDIAL PATCHING ($1.25 PER HOUR) AND ABRASIVE BLASTING/LEAD ABATEMENT ($1.50 PER HOUR). EMPLOYEES WORKING OVER 30 FEET (EXCLUDING WORK FROM A LIFT 60 FEET AND LOWER) SHALL RECEIVE ONE DOLLAR ($1.00) PER HOUR ABOVE THE BASIC HOURLY RATE IN ADDITION TO ANY OTHER PREMIUM PAY.
Y
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
Z
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AA
SUNDAY IS PAID AT SATURDAY OVERTIME HOURLY RATE.
AB
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AC
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AD
INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME.EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE
AE
8 HOURS PAY FOR 7 HOURS WORKED AT STRAIGHT-TIME BASIC HOURLY RATE.
AF
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AG
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AH
AMOUNT IS FOR VALLEY MORTAR TRADES FUND AND INDUSTRY STABILIZATION FUND
AI
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AJ
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AK
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN.
AL
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AM
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN
AN
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AO
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
AP
AMOUNT IS FOR THE ROOFERS AND WATERPROOFERS RESEARCH AND EDUCATION JOINT TRUST FUND.
AQ
WHEN ADVERSE WEATHER OR JOB SCHEDULING PROBLEMS EXIST CAUSING AN EMPLOYEE TO WORK LESS THAN FORTY (40) HOURS IN A WEEK SATURDAY MAY BE USED AS A MAKE-UP DAY AT STRAIGHT TIME WAGE RATES.
AR
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AS
INCLUDES $0.05 FOR SCHOLAR FUND.
AT
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AU
BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE BASED ON THE DAVIS-BACON WAGE DETERMINATION FOR THIS CRAFT.
AV
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AW
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AX
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
AY
RATE APPLIES TO THE FIRST 9 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AZ
RATE APPLIES TO THE FIRST YEAR OF EMPLOYMENT ONLY: $0.67 AFTER 2 YEARS; $0.87 AFTER 8 YEARS; $1.07 AFTER 15 YEARS.
BA
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAY. DOUBLE-TIME IS PAID FOR WORK ON HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
BB
RATE APPLIES TO THE FIRST YEAR OF EMPLOYMENT ONLY: $0.70 AFTER 2 YEARS; $0.92 AFTER 8 YEARS; $1.13 AFTER 15 YEARS.
BC
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY. $0.59 AFTER 2 YEARS; $0.76 AFTER 8 YEARS; $0.94 AFTER 15 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page