GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: AMADOR COUNTY

DETERMINATION: AMA-2025-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE STRAIGHT-TIME TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2024 04/30/2025** $50.010 A $12.400 $11.020 $2.750 B $0.800 $2.170 C 8.0 D $79.150 $105.530 E $105.530 E $131.910 HolidaysScope of WorkTravel & Subsistence
#BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2024 06/30/2025** $53.960 A $12.400 $12.770 $0.000 F $1.610 $0.430 8.0 D $81.170 $108.150 G $108.150 H $135.130 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2024 06/30/2025** $40.790 I $10.600 $13.460 $0.000 F $0.450 $0.400 8.0 $65.700 $86.100 J $86.100 J $106.490 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, RESILIENT TILE LAYER 02/22/2025 12/31/2025** $50.390 A $11.750 $15.310 $0.000 K $0.880 $0.340 8.0 $78.670 $103.870 L $103.870 L $129.060 M HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2024 02/28/2025* $36.600 $15.000 $6.850 N $0.000 $1.000 $1.110 O 8.0 $61.840 $80.780 P $80.780 P $99.720 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2024 02/28/2025* $42.090 $15.000 $6.850 N $0.000 $1.000 $1.110 O 8.0 $67.520 $89.300 P $89.300 P $111.080 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: INSIDE WIREMAN 02/22/2025 07/31/2025** $49.200 $14.060 $13.250 N $0.000 F $1.890 $7.900 Q 8.0 $88.570 $114.290 $114.290 $140.020 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: CABLE SPLICER 02/22/2025 07/31/2025** $54.120 $14.060 $13.250 N $0.000 F $1.890 $7.900 Q 8.0 $93.710 $122.020 $122.020 $150.330 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) R 02/22/2025 03/31/2025* $16.500 & $1.150 $1.250 $1.520 $0.000 $0.000 8.0 $20.420 $28.670 $28.670 $36.920 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN (018.167-034) R 02/22/2025 03/31/2025* $16.500 & $1.150 $1.250 $1.490 $0.000 $0.000 8.0 $20.390 $28.640 $28.640 $36.890 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) R 02/22/2025 03/31/2025* $16.500 & $1.150 $1.250 $1.460 $0.000 $0.000 8.0 $20.360 $28.610 $28.610 $36.860 HolidaysScope of WorkTravel & Subsistence
#GLAZIER S 02/22/2025 12/31/2025** $46.690 A $11.750 $23.170 T $0.000 $1.140 $0.550 U 8.0 $83.300 $106.650 V $129.990 $129.990 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER W 08/22/2024 07/31/2025** $42.060 X $12.400 $6.330 $0.000 K $0.450 $0.950 8.0 $62.190 $83.220 Y $104.250 $104.250 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON W 08/22/2024 07/31/2025** $61.720 X $12.400 $16.190 $0.000 K $0.800 $1.300 8.0 $92.410 $123.270 Y $154.130 $154.130 HolidaysScope of WorkTravel & Subsistence
#PAINTER Z 02/22/2025 12/31/2025** $43.400 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 D $66.730 $88.430 AB $88.430 AB $110.130 HolidaysScope of WorkTravel & Subsistence
#PAINTER INDUSTRIAL PAINTER AC 02/22/2025 12/31/2025** $45.900 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 D $69.230 $92.180 AB $92.180 AB $115.130 HolidaysScope of WorkTravel & Subsistence
#PAINTER BRIDGE PAINTER AD 02/22/2025 12/31/2025** $47.900 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 D $71.230 $95.180 AB $95.180 AB $119.130 HolidaysScope of WorkTravel & Subsistence
#PAINTER: TAPER 02/22/2025 06/30/2025** $59.580 AE $11.750 $18.490 $0.000 K $1.050 $0.710 8.0 $91.580 $121.370 AF $121.370 AF $151.160 AG HolidaysScope of WorkTravel & Subsistence
#PLASTERER 02/22/2025 06/30/2025** $49.530 AH $15.430 $19.490 $0.000 F $1.300 $1.340 8.0 $87.090 $108.660 AI $108.660 AJ $130.220 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2024 06/30/2025** $41.020 $10.600 $15.780 $3.930 $0.520 $0.630 AK 8.0 $72.480 $92.990 L $92.990 L $113.500 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) AL 02/22/2025 06/30/2025** $55.950 $13.280 $22.860 $0.000 F $1.500 $2.420 8.0 $96.010 $123.990 E $123.990 E $151.960 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PIPE TRADESMAN AL 02/22/2025 06/30/2025* $22.380 $10.760 $1.000 $0.000 F $0.000 $0.710 8.0 $34.850 $46.040 E $46.040 E $57.230 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2024 06/30/2025* $34.510 $12.400 $3.000 AM $2.500 $0.400 $0.800 8.0 $53.610 $70.870 $70.870 D $88.120 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: LANDSCAPE PIPEFITTER 08/22/2024 06/30/2025* $34.510 $12.400 $3.000 AM $2.500 $0.400 $0.800 8.0 $53.610 $70.870 $70.870 D $88.120 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AN 08/22/2024 06/30/2025* $20.660 $12.400 $3.000 AM $2.500 $0.400 $0.800 8.0 $39.760 $50.090 $50.090 D $60.420 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AO 08/22/2024 06/30/2025* $20.660 $12.400 $3.000 AM $2.500 $0.400 $0.800 8.0 $39.760 $50.090 $50.090 D $60.420 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AP 08/22/2024 06/30/2025* $17.320 $12.400 $3.000 AM $2.500 $0.400 $0.800 8.0 $36.420 $45.080 $45.080 D $53.740 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AQ 08/22/2024 06/30/2025* $17.320 $12.400 $0.000 AM $2.500 $0.400 $0.800 8.0 $33.420 $42.080 $42.080 D $50.740 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AQ 08/22/2024 06/30/2025* $17.320 $12.400 $3.000 AM $2.500 $0.400 $0.800 8.0 $36.420 $45.080 $45.080 D $53.740 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER AR 02/22/2025 06/30/2025** $64.370 A $12.650 $14.900 AM $0.000 F $1.350 $0.700 8.0 $93.970 $126.160 E $126.160 AS $158.340 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER (FOR TOTAL PLUMBING JOBS $150,000 OR UNDER) AR 02/22/2025 06/30/2025* $53.080 A $10.520 $11.300 $0.000 F $1.350 $0.700 8.0 $76.950 $103.490 E $103.490 AT $130.030 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 02/22/2025 03/31/2025* $48.650 $12.400 $15.620 AU $0.000 $0.540 $0.250 8.0 $77.460 $101.790 $101.790 $126.110 HolidaysScope of WorkTravel & Subsistence
#ROOFER 08/22/2024 07/31/2025* $45.000 $12.100 $9.500 $4.650 $0.590 $0.290 8.0 $72.130 $94.630 L $94.630 AV $117.130 HolidaysScope of WorkTravel & Subsistence
#ROOFER BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER 08/22/2024 07/31/2025* $48.000 $12.100 $9.500 $4.650 $0.590 $0.290 8.0 $75.130 $99.130 L $99.130 AV $123.130 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2024 06/30/2025** $52.500 A $16.600 $28.120 AW $0.000 F $1.540 $0.870 8.0 $99.630 $128.210 E $128.210 E $156.780 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER (HVAC) METAL DECK & SIDING 02/22/2002 03/31/2002* $30.160 AX $0.000 $0.000 $0.000 $10.500 AY $0.000 8.0 $40.660 $55.740 $55.740 $55.740 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AZ 08/22/2024 06/30/2025** $44.930 BA $12.400 $7.120 $0.000 F $0.800 $1.090 8.0 $66.340 $86.190 BB $86.190 BB $106.030 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AZ 08/22/2024 06/30/2025** $60.580 BA $12.400 $15.680 $0.000 F $0.800 $1.340 8.0 $90.800 $117.560 BB $117.560 BB $144.310 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2024 03/31/2025* $33.760 BC $11.960 $6.210 $1.000 $0.500 $1.420 8.0 D $54.850 $71.730 $71.730 BD $88.610 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER RED CIRCLED FINISHER 08/22/2024 03/31/2025* $38.320 BC $11.960 $7.050 $1.300 $0.500 $1.480 8.0 D $60.610 $79.770 $79.770 BD $98.930 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2024 03/31/2025* $52.420 BC $11.960 $9.020 $2.750 $0.750 $2.060 8.0 D $78.960 $105.170 $105.170 BD $131.380 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: 08/22/2024 06/30/2025** $31.160 $10.160 $3.540 $1.560 BE $0.000 $0.000 8.0 $46.420 $62.000 BF $62.000 BF $62.000 BF HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: PUMP INSTALLER 08/22/2024 06/30/2025** $31.160 $10.160 $3.540 $1.560 BE $0.000 $0.000 8.0 $46.420 $62.000 BF $62.000 BF $62.000 BF HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: HELPER 08/22/2024 06/30/2025** $26.680 $10.160 $3.540 $1.330 BG $0.000 $0.000 8.0 $41.710 $55.050 BF $55.050 BF $55.050 BF HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY COUNCIL.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
H
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
I
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
J
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
K
INCLUDED IN BASIC HOURLY RATE.
L
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
M
DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.
N
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
O
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
P
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT OVERTIME HOURLY RATE.
Q
IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
R
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
S
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
T
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
U
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
V
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
W
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
X
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
Y
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
Z
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES WORKING ON COMMERCIAL PROJECTS SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES A SWINGING AND/OR PLATFORM SUSPENSION SYSTEM. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AA
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
AB
RATE APPLIES TO FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY, FIRST 12 HOURS WORKED ON SATURDAYS AND ALL HOURS WORKED ON DESIGNATED DAYS OFF. ALL OTHER OVERTIME IS PAID AT SUNDAY/HOLIDAY RATE.
AC
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AD
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AE
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AF
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AG
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AH
INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME.EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE
AI
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AJ
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AK
INCLUDES AN AMOUNT FOR INDUSTRY STABILIZATION FUND.
AL
RATE APPLIES TO THE PORTION OF THE COUNTY SOUTH OF SUTTER CREEK.
AM
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AN
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AO
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN.
AP
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AQ
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN
AR
RATE APPLIES TO THE PORTION OF THE COUNTY NORTH OF SUTTER CREEK.
AS
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AT
RATE APPLIES TO THE FIRST 10 HOURS ON SATURDAY IF HOURS WORKED ARE UNDER 40 HOURS PER WEEK. FOR WORK OVER 40 HOURS IN ONE WEEK, THE SATURDAY RATE IS 1.5X THE BASIC HOURLY RATE (NO FRINGE BENEFITS ARE INCLUDED). ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AU
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AV
RATE APPLIES TO FIRST 12 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORKWEEK MAY BE WORKED AT STRAIGHT-TIME IF THE JOB IS SHUT DOWN FOR 1 OR MORE DAYS DURING THE NORMAL WORKWEEK DUE TO ADVERSE WEATHER CONDITIONS.
AW
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AX
BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE BASED ON THE DAVIS-BACON WAGE DETERMINATION FOR THIS CRAFT.
AY
THIS REPRESENTS THE LUMP SUM FRINGE BENEFIT AMOUNT PUBLISHED IN THE DAVIS-BACON WAGE DETERMINATION FOR THIS CLASSIFICATION IN THIS COUNTY.
AZ
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
BA
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
BB
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
BC
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BD
RATE APPLIES TO THE FIRST 9 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
BE
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $2.16 AFTER 2 YEARS OF EMPLOYMENT.
BF
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
BG
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $1.85 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page