GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SANTA CLARA COUNTY

DETERMINATION: STC-2021-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE STRAIGHT-TIME TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS SHIFT PROVISIONS
#BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (2ND SHIFT) 08/22/2020 06/30/2021** $60.660 A $10.750 $12.970 $0.000 B $1.580 $0.430 8.0 C $86.390 $116.720 $116.720 D $147.050 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (3RD SHIFT) 08/22/2020 06/30/2021** $63.300 A $10.750 $12.970 $0.000 B $1.580 $0.430 8.0 C $89.030 $120.680 $120.680 D $152.330 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (2ND SHIFT) 08/22/2020 04/30/2021** $51.360 A $10.750 $10.420 $3.000 E $0.800 $1.860 F 8.0 C $78.190 $105.370 G $105.370 G $132.550 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (3RD SHIFT) 08/22/2020 04/30/2021** $53.830 A $10.750 $10.420 $3.000 E $0.800 $1.860 F 8.0 C $80.660 $109.070 G $109.070 G $137.490 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICK TENDER BRICK TENDER (SPECIAL SINGLE SHIFT) 08/22/2020 06/30/2021** $38.180 H $9.000 $11.770 $0.000 B $0.450 $0.300 8.0 $59.700 $78.790 I $78.790 I $97.880 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#CARPET, LINOLEUM, SOFT FLOOR LAYER (SPECIAL SHIFT) 02/22/2021 12/31/2021** $63.670 A $10.550 $17.330 $0.000 J $1.050 $0.340 8.0 $92.940 $156.610 $156.610 $156.610 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM INSTALLER, SECOND SHIFT 02/22/2021 11/30/2021** $53.370 $11.900 $8.150 K $0.000 $1.100 $0.260 L 8.0 $76.650 $104.270 M $104.270 M $131.890 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM INSTALLER, THIRD SHIFT 02/22/2021 11/30/2021** $59.790 $11.900 $8.150 K $0.000 $1.100 $0.260 L 8.0 $83.290 $114.240 M $114.240 M $145.180 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM TECH., SECOND SHIFT 02/22/2021 11/30/2021** $61.380 $11.900 $8.150 K $0.000 $1.100 $0.260 L 8.0 $84.940 $116.710 M $116.710 M $148.470 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM TECH., THIRD SHIFT 02/22/2021 11/30/2021** $68.760 $11.900 $8.150 K $0.000 $1.100 $0.260 L 8.0 $92.570 $128.150 M $128.150 M $163.740 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN SECOND SHIFT O 08/22/2020 05/31/2021* $83.390 P $15.800 $20.900 Q $0.000 $1.500 $0.660 R 8.0 $124.750 $167.700 S $167.700 S $210.640 T HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN THIRD SHIFT O 08/22/2020 05/31/2021* $93.980 P $15.800 $20.900 Q $0.000 $1.500 $0.710 R 8.0 $135.710 $184.110 S $184.110 S $232.510 T HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: CABLE SPLICER, 2ND SHIFT O 08/22/2020 05/31/2021* $96.480 P $15.800 $20.900 Q $0.000 $1.500 $0.720 R 8.0 $138.290 $187.980 S $187.980 S $237.670 T HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: CABLE SPLICER, 3RD SHIFT O 08/22/2020 05/31/2021* $108.080 P $15.800 $20.900 Q $0.000 $1.500 $0.780 R 8.0 $150.300 $205.960 S $205.960 S $261.620 T HolidaysScope of WorkTravel & Subsistence Shift Provisions
#FIELD SURVEYOR: CHIEF OF PARTY (NIGHT SHIFT) U 02/22/2021 02/28/2022* $55.830 $13.880 $12.010 V $4.870 W $1.210 $0.190 7.0 $87.990 $115.900 X $115.900 X $143.820 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#FIELD SURVEYOR: INSTRUMENTMAN (NIGHT SHIFT) U 02/22/2021 02/28/2022* $52.360 $13.880 $12.010 V $4.870 W $1.210 $0.190 7.0 $84.520 $110.700 X $110.700 X $136.880 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#FIELD SURVEYOR: CHAINMAN/RODMAN (NIGHT SHIFT) U 02/22/2021 02/28/2022* $49.120 $13.880 $12.010 V $4.870 W $1.210 $0.190 7.0 $81.280 $105.840 X $105.840 X $130.400 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#GLAZIER GLAZIER (2ND SHIFT) Y 02/22/2021 06/30/2021* $58.330 A $10.550 $19.550 Z $0.000 $1.050 $0.380 AA 7.5 AB $89.860 $119.030 AC $148.190 $148.190 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#GLAZIER GLAZIER (3RD SHIFT) Y 02/22/2021 06/30/2021* $60.980 A $10.550 $19.550 Z $0.000 $1.050 $0.380 AA 7.5 AB $92.510 $123.000 AC $153.490 $153.490 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#MARBLE FINISHER MARBLE FINISHER (2ND SHIFT) AD 08/22/2020 07/31/2021** $41.530 AE $10.750 $5.340 $0.000 J $0.450 $0.870 8.0 $58.940 $79.710 AF $100.470 $100.470 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#MARBLE MASON MARBLE MASON (2ND SHIFT) AD 08/22/2020 07/31/2021** $57.300 AE $10.750 $16.120 $0.000 J $0.800 $1.190 8.0 $86.160 $114.810 AF $143.460 $143.460 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PAINTER PAINTER (SPECIAL SHIFT) AG 02/22/2021 12/31/2021** $51.950 H $10.550 $14.070 V $0.000 J $0.860 $0.380 8.0 C $77.810 $103.790 AH $103.790 AH $129.760 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PAINTER INDUSTRIAL PAINTER (SPECIAL SHIFT) AI 02/22/2021 12/31/2021** $54.250 H $10.550 $14.070 V $0.000 J $0.860 $0.380 8.0 C $80.110 $107.240 AH $107.240 AH $134.360 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PAINTER BRIDGE PAINTER (SPECIAL SHIFT) AJ 02/22/2021 12/31/2021** $56.550 H $10.550 $14.070 V $0.000 J $0.860 $0.380 8.0 C $82.410 $110.680 AH $110.680 AH $138.960 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC)(2ND SHIFT) 08/22/2020 06/30/2021* $76.660 A $16.960 AK $25.420 AL $0.000 B $1.950 $0.900 AM 7.5 AN $121.890 $164.970 G $164.970 G $208.050 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC)(3RD SHIFT) 08/22/2020 06/30/2021* $76.660 A $16.960 AK $25.420 AL $0.000 B $1.950 $0.900 AM 7.0 AO $121.890 $164.970 G $164.970 G $208.050 HolidaysScope of WorkTravel & Subsistence Shift Provisions
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 2)(2ND SHIFT) 08/22/2020 06/30/2021* $26.430 A $10.700 AP $0.500 AP $0.000 B $0.000 $0.250 AQ 7.5 AN $37.880 $51.100 G $51.100 G $64.310 HolidaysScope of WorkTravel & Subsistence Shift Provisions
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 2)(3RD SHIFT) 08/22/2020 06/30/2021* $26.430 A $10.700 AP $0.500 AP $0.000 B $0.000 $0.250 AQ 7.0 AO $37.880 $51.100 G $51.100 G $64.310 HolidaysScope of WorkTravel & Subsistence Shift Provisions
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 3)(2ND SHIFT) 08/22/2020 06/30/2021* $32.870 A $10.700 AP $0.500 AP $0.000 B $0.000 $0.250 AQ 7.5 AN $44.320 $60.760 G $60.760 G $77.190 HolidaysScope of WorkTravel & Subsistence Shift Provisions
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 3)(3RD SHIFT) 08/22/2020 06/30/2021* $32.870 A $10.700 AP $0.500 AP $0.000 B $0.000 $0.250 AQ 7.0 AO $44.320 $60.760 G $60.760 G $77.190 HolidaysScope of WorkTravel & Subsistence Shift Provisions
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 4)(2ND SHIFT) 08/22/2020 06/30/2021* $34.450 A $10.700 AP $0.500 AP $0.000 B $0.000 $0.250 AQ 7.5 AN $45.900 $63.130 G $63.130 G $80.350 HolidaysScope of WorkTravel & Subsistence Shift Provisions
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 4)(3RD SHIFT) 08/22/2020 06/30/2021* $34.450 A $10.700 AP $0.500 AP $0.000 B $0.000 $0.250 AQ 7.0 AO $45.900 $63.130 G $63.130 G $80.350 HolidaysScope of WorkTravel & Subsistence Shift Provisions
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 5)(2ND SHIFT) 08/22/2020 06/30/2021* $37.890 A $10.700 AP $2.250 AP $0.000 B $0.000 $0.250 AQ 7.5 AN $51.090 $70.030 G $70.030 G $88.980 HolidaysScope of WorkTravel & Subsistence Shift Provisions
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 5)(3RD SHIFT) 08/22/2020 06/30/2021* $37.890 A $10.700 AP $2.250 AP $0.000 B $0.000 $0.250 AQ 7.0 AO $51.090 $70.030 G $70.030 G $88.980 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PLUMBER: SERVICE AND REPAIR (2ND SHIFT) 08/22/2020 06/30/2021* $76.660 A $16.960 AK $25.420 AL $0.000 B $1.950 $0.900 AM 7.5 AN $121.890 $164.970 $164.970 AR $164.970 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PLUMBER: SERVICE AND REPAIR (3RD SHIFT) 08/22/2020 06/30/2021* $76.660 A $16.960 AK $25.420 AL $0.000 B $1.950 $0.900 AM 7.0 AO $121.890 $164.970 $164.970 AR $164.970 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SHEET METAL WORKER (SPECIAL SHIFT) 08/22/2020 06/27/2021** $71.750 H $14.850 AS $29.740 AT $0.000 B $1.530 $0.710 8.0 $118.580 $158.010 AU $158.010 AU $197.450 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SHEET METAL WORKER (2ND SHIFT) 08/22/2020 06/27/2021** $70.470 H $14.850 AS $29.740 AT $0.000 B $1.530 $0.710 7.5 AN $117.300 $156.100 AU $156.100 AU $194.890 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SHEET METAL WORKER (3RD SHIFT) 08/22/2020 06/27/2021** $73.670 H $14.850 AS $29.740 AT $0.000 B $1.530 $0.710 7.0 AO $120.500 $160.890 AU $160.890 AU $201.290 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS (SPECIAL SHIFT) 08/22/2020 06/27/2021** $62.630 H $14.850 AS $28.200 AT $0.000 B $1.530 $0.710 8.0 $107.920 $142.340 AU $142.340 AU $176.760 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS (2ND SHIFT) 08/22/2020 06/27/2021** $61.510 H $14.850 AS $28.200 AT $0.000 B $1.530 $0.710 7.5 AN $106.800 $140.670 AU $140.670 AU $174.520 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS (3RD SHIFT) 08/22/2020 06/27/2021** $64.310 H $14.850 AS $28.200 AT $0.000 B $1.530 $0.710 7.0 AO $109.600 $144.870 AU $144.870 AU $180.120 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (SPECIAL SHIFT) 08/22/2020 06/27/2021** $49.220 H $14.250 AV $15.480 AT $0.000 B $1.430 $0.710 8.0 $81.090 $106.960 AW $106.960 AW $132.810 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (2ND SHIFT) 08/22/2020 06/27/2021** $48.350 H $14.250 AV $15.480 AT $0.000 B $1.430 $0.710 7.5 AN $80.220 $105.660 AW $105.660 AW $131.070 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (3RD SHIFT) 08/22/2020 06/27/2021** $50.540 H $14.250 AV $15.480 AT $0.000 B $1.430 $0.710 7.0 AO $82.410 $108.940 AW $108.940 AW $135.450 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (SPECIAL SHIFT) 08/22/2020 06/27/2021** $44.330 H $14.250 AV $10.210 AT $0.000 B $1.430 $0.710 8.0 $70.930 $93.900 AW $93.900 AW $116.860 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (2ND SHIFT) 08/22/2020 06/27/2021** $43.540 H $14.250 AV $10.210 AT $0.000 B $1.430 $0.710 7.5 AN $70.140 $92.710 AW $92.710 AW $115.280 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (3RD SHIFT) 08/22/2020 06/27/2021** $45.520 H $14.250 AV $10.210 AT $0.000 B $1.430 $0.710 7.0 AO $72.120 $95.680 AW $95.680 AW $119.240 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (SPECIAL SHIFT) 08/22/2020 06/27/2021** $38.840 H $14.250 AV $4.910 AT $0.000 B $1.410 $0.710 8.0 $60.120 $80.080 AU $80.080 AU $100.040 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (2ND SHIFT) 08/22/2020 06/27/2021** $38.150 H $14.250 AV $4.910 AT $0.000 B $1.410 $0.710 7.5 AN $59.430 $79.050 AU $79.050 AU $98.660 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (3RD SHIFT) 08/22/2020 06/27/2021** $39.880 H $14.250 AV $4.910 AT $0.000 B $1.410 $0.710 7.0 AO $61.160 $81.650 AU $81.650 AU $102.120 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (SPECIAL SHIFT) 02/22/2021 06/27/2021** $45.720 H $14.250 AS $10.490 AT $0.000 B $1.410 $0.710 8.0 $72.580 $96.190 AU $96.190 AU $119.800 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (2ND SHIFT) 02/22/2021 06/27/2021** $44.900 H $14.250 AS $10.490 AT $0.000 B $1.410 $0.710 7.5 AN $71.760 $94.960 AU $94.960 AU $118.160 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (3RD SHIFT) 02/22/2021 06/27/2021** $46.940 H $14.250 AS $10.490 AT $0.000 B $1.410 $0.710 7.0 AO $73.800 $98.020 AU $98.020 AU $122.240 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO FINISHER TERRAZZO FINISHER, 2ND SHIFT AX 08/22/2020 06/30/2021** $43.670 AY $10.750 $5.870 $0.000 B $0.800 $1.000 8.0 $62.090 $81.590 AU $81.590 AU $101.090 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO FINISHER TERRAZZO FINISHER, 3RD SHIFT AX 08/22/2020 06/30/2021** $43.670 AY $10.750 $5.870 $0.000 B $0.800 $1.000 8.0 $62.090 $81.590 AU $81.590 AU $101.090 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO WORKER TERRAZZO WORKER, 2ND SHIFT AX 08/22/2020 06/30/2021** $58.660 AY $10.750 $15.370 $0.000 B $0.800 $1.220 8.0 $86.800 $113.050 AU $113.050 AU $139.300 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO WORKER TERRAZZO WORKER, 3RD SHIFT AX 08/22/2020 06/30/2021** $58.660 AY $10.750 $15.370 $0.000 B $0.800 $1.220 8.0 $86.800 $113.050 AU $113.050 AU $139.300 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TILE FINISHER TILE FINISHER, 2ND SHIFT 08/22/2020 03/31/2021* $35.220 AZ $10.310 $5.300 $1.000 $0.820 $1.060 8.0 $53.710 $68.820 $68.820 C $83.930 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TILE FINISHER TILE FINISHER - RED CIRCLED FINISHER, 2ND SHIFT 08/22/2020 03/31/2021* $41.100 AZ $10.310 $6.080 $1.500 $0.820 $1.130 8.0 $60.940 $78.990 $78.990 C $97.040 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TILE SETTER TILE SETTER, 2ND SHIFT 08/22/2020 03/31/2021* $55.530 AZ $10.310 $7.800 $2.500 $1.170 $1.750 8.0 $79.060 $103.820 $103.820 C $128.590 HolidaysScope of WorkTravel & Subsistence Shift Provisions

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
E
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
F
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
G
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
J
INCLUDED IN BASIC HOURLY RATE.
K
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
L
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
M
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
N
DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
O
FOR SHIFT RATES ON OCCUPIED REMODEL AND RENOVATION WORK, PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415)703-4774.
P
INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
Q
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
R
INCLUDES AMOUNT EQUAL TO 0.5% OF THE HOURLY RATE FOR THE ADMINISTRATIVE MAINTENANCE FUND AND THE REMAINING AMOUNT IS FOR THE JOINT ELECTRICAL INDUSTRY FUND.
S
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS UP TO A MAXIMUM OF 10 HOURS IN ANY ONE WEEK OR THE FIRST 8 HOURS WORKED ON SATURDAY IF NO OVERTIME HAS BEEN WORKED DURING THE WEEK. IF OVERTIME IS WORKED MONDAY THROUGH FRIDAY, SUBTRACT THAT AMOUNT OF TIME FROM THE TIME ALLOWED AT TIME AND ONE HALF (1 1/2) ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
T
DISREGARD THIS RATE. FOR ALL HOURS IN EXCESS OF THE FIRST EIGHT HOURS OF WORK PERFORMED ON SATURDAY AND FOR ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS, USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
U
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
V
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
W
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
X
RATE APPLIES TO DAILY OVERTIME HOURS UP TO AND INCLUDING 12 HOURS WORKED, SUNDAY NIGHT THROUGH THURSDAY NIGHT, OR OTHER OVERTIME HOURS BEYOND 35 HOURS IN A WORKWEEK. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY SHIFT DIFFERENTIAL RATE. IN THE EVENT THAT THERE ARE LESS THAN 35 HOURS WORKED SUNDAY THROUGH THURSDAY, THEN THE BALANCE OF HOURS WORKED UP TO AND INCLUDING 35 HOURS FOR THE WORKWEEK, OR UP TO 7 HOURS FOR THE WORKDAY, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME SHIFT DIFFERENTIAL RATE.
Y
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
Z
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
AA
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
AB
8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE
AC
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
AD
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
AE
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AF
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AG
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($2.00 PER HOUR), EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AH
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AI
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AJ
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AK
INCLUDES AN AMOUNT FOR HEALTH AND WELFARE EXTENDED RESERVE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AL
INCLUDES AN AMOUNT FOR 401A-PART B PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AM
$0.50 TO SUPPLEMENTAL UNEMPLOYMENT.
AN
8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7.5 HOURS WORKED
AO
8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7 HOURS WORKED
AP
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AQ
AMOUNT IS FOR CONTRACT ADMINISTRATION
AR
SATURDAY MAY BE PAID AT STRAIGHT TIME IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY.
AS
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AT
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AU
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AV
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AW
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AX
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AY
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AZ
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES AN AMOUNT OF PREMIUM RATE PER HOUR ABOVE THE REGULAR STRAIGHT-TIME RATE, WHICH IS NOT FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page