J |
|
|
|
|
|
|
List of Acronyms |
JACKING
EQUIPMENT |
|
|
|
|
|
|
|
Lift-slab operations |
|
|
|
|
CSO, §1722.1 |
|
Vertical Slip Form operations |
|
|
|
CSO, §1719 |
JACKS |
|
|
|
|
|
|
GISO, §3562 |
|
Access Restrictions, Adjacent to Lifting
Operation |
|
GISO, §3562(e) |
|
Antifreeze / Hydraulic Fluid |
|
|
|
GISO, §3562(c) |
|
Blocking Requirements |
|
|
|
|
GISO, §3562(d) |
|
Cleaning / Lubricating |
|
|
|
|
GISO, §3562(f) |
|
Design / Maximum Safe Extension |
|
|
|
GISO, §3562(b) |
|
Foundation /Support, for |
|
|
|
GISO, §3562(d) |
|
Loading Limit Marked |
|
|
|
|
GISO, §3562(a) |
|
Lubricating /
Cleaning |
|
|
|
|
GISO, §3562(f) |
|
Rated Load Capacity, Marked |
|
|
|
GISO, §3562(a) |
JACKS, Roof Jacks |
|
|
|
|
|
CSO, §1724(a) |
JACK SCAFFOLDS, Pump Jack Scaffolds |
|
|
|
CSO, §1655 |
JACOB'S LADDER (Chain or Wire Rope Ladder) |
|
|
|
|
|
Construction Operations per CSO |
|
|
|
CSO, §1603(h) & (i) |
|
|
Definition In CSO |
|
|
|
CSO, §1504(a) |
|
Petroleum Refineries, Transportation &
Handling |
|
|
|
|
|
Approval of |
|
|
|
PSO-R,T&H, §6799.1(b) |
|
|
Definition In PSO, R,T&H |
|
|
PSO-R,T&H, §6755 |
|
|
Inspection & Load testing of, In PSO, R,T&H |
|
PSO-R,T&H, §6799.1(c) |
|
|
Use of Jacob's Ladder |
|
|
|
PSO-R,T&H, §6799.1(e) |
|
|
Use Plan |
|
|
|
|
PSO-R,T&H, §6799.1(d) |
|
Tunneling Operations per TSO, Access in Shafts
& Inclines |
|
TSO, §8494(a)(1) |
J-BOX, Covers |
|
|
|
|
|
ESO-LV, §2340.23 |
JEWELRY,
WATCHES, RINGS, Wearing around Machinery, Prohibition |
|
GISO, §3384, Note 2 |
JOB BUILD |
|
|
|
|
|
|
|
Ladders |
|
|
|
|
|
CSO, §1676 |
|
Impalement Protective Covers, Rebar |
|
|
|
CSO, §1712(d) |
JOB ROTATION, Ergonomic Standard |
|
|
|
|
|
Control of Exposures, RMI Prevention Program
Requirements |
|
GISO, §5110(b)(2) |
JOBSITE
VEHICLES |
|
|
|
|
|
CSO, §1597 |
|
Brakes, Lights, Operable |
|
|
|
|
CSO, §1597(c) |
|
Brakes, Maintained, Operable |
|
|
|
CSO, §1597(a) |
|
Diesel Engine Exhaust Retrofits per |
CSO, §1591(m) |
|
CSO, §1597(l) |
|
|
Access of Vehicle not Obstructed |
|
|
CSO, §1591(m)(2) |
|
|
Engine Performance |
|
|
|
CSO, §1591(m)(1) |
|
|
Exhaust Retrofit, Definition |
|
|
CSO, §1504(a) |
|
|
Installation of Exhaust Retrofit |
|
|
CSO, §1591(m) |
|
|
Fire Hazard, Effectively Shielded |
|
|
CSO, §1591(m)(3) |
|
|
Hot Surfaces of Exhaust System, Operator
Shielding from |
CSO, §1591(m)(4) |
|
|
Obstruction of Operator's View |
|
|
CSO, §1591(m)(5) |
|
|
Exhaust Stack Requirements |
|
|
CSO, §1591(m)(6) |
|
|
Maintenance of Exhaust Retrofit |
|
|
CSO, §1591(m) |
|
|
Visibility Testing Applied to Exhaust Retrofit |
|
CSO, §1591, Appx A |
|
Fenders, Mud Flaps |
|
|
|
|
CSO, §1597(i) |
|
Inspection at beginning of shift |
|
|
|
CSO, §1597 |
|
Lights, Headlights, Taillights, Operable |
|
|
CSO, §1597(b) |
|
Mud Flaps |
|
|
|
|
|
CSO, §1597(i) |
|
Safety Check, Vehicle |
|
|
|
|
CSO, §1597(j) |
|
Seatbelts, Installed |
|
|
|
|
CSO, §1597(g) |
|
|
Use of Seatbelts |
|
|
|
CSO, §1597(h) |
|
Seats, Adequate number, Secured |
|
|
|
CSO, §1597(f) |
|
Temporary Covers in Roadways, Secured |
|
|
CSO, §1597(k) |
|
Tools & material, Secured |
|
|
|
CSO, §1597(e) |
|
Traffic Control |
|
|
|
|
CSO, §1598 |
|
|
Flaggers |
|
|
|
|
CSO, §1599 |
|
|
|
Employees exposed to Vehicle Traffic at
Excavations |
CSO, §1541(d) |
|
|
|
High Visibility Safety Apparel, Flaggers,
warning garments |
CSO, §1599(d) |
|
|
|
High Visibility Safety Apparel, Flaggers, during
hours of darkness |
CSO, §1599(e) |
|
|
|
High Visibility Safety Apparel, Flaggers, proper
type |
CSO, §1599(f) |
|
|
|
Number of Flaggers |
|
|
CSO, §1599(a) |
|
|
|
Traffic Control & Barricades, Public Streets
& Highways |
CSO, §1598 |
|
Transport Employees |
|
|
|
|
CSO, §1597(f) |
|
Vehicles Safety Check |
|
|
|
|
CSO, §1597(j) |
|
Windshields / Wipers / Defogger / Defroster |
|
|
CSO, §1597(d) |
JOB TRAINING |
|
|
|
|
See TRAINING |
|
JOINTERS, Woodworking |
|
|
|
|
GISO, §4311 |
JOINT POWER
& TELE-COM MAN HOLES |
|
|
|
TelSO, §8616(d) |
|
First Aid Training |
|
|
|
|
TelSO, §8616(b) |
JOISTS |
|
|
|
|
|
|
|
|
Structural steel erection, |
|
|
|
|
CSO, §1710 |
|
|
Bridging terminus points, illustrations |
|
CSO, §1710, Appx A |
|
|
Double connections, illustrations |
|
|
CSO, §1710, Appx B |
JUMBOS, Use in Tunneling operations, per TSO |
|
|
|
TSO, §8450 |
JUMPERS, Electrical Equipment Bonding |
|
|
|
ESO-LV, §2395.79 |
|
Attachment |
|
|
|
|
|
ESO-LV, §2395.79(b) |
|
Installation |
|
|
|
|
|
ESO-LV, §2395.79(c) |
|
Material |
|
|
|
|
|
ESO-LV, §2395.79(a) |
JUMP SAWS, Woodworking |
|
|
|
|
GISO, §4306 |
|
Guarding and Point of Operation Guarding |
|
|
GISO, §4306(b), (e) |
JUNCTION BOX
COVERS |
|
|
|
|
ESO-LV, §2473.2(a) |
|
Covers Required, High Voltage |
|
|
|
ESO-HV, §2745.2 |
JUNCTION BOXES, High Voltage |
|
|
|
|
ESO-HV, Article 8 |
|
Conductors Entering Boxes, Cabinets or
Fittings |
|
|
ESO-HV, §2754.1 |
|
Construction & installation
Requirements |
|
|
ESO-HV, §2753 |
|
Covers & Canopies |
|
|
|
|
ESO-HV, §2754.2 |
|
Size of Pull Boxes & Raceway Entrance
Locations |
|
|
ESO-HV, §2752 |
|
|
|
|
|
|
|
|