GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: ALAMEDA COUNTY

DETERMINATION: ALA-2022-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE STRAIGHT-TIME TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS SHIFT PROVISIONS
#BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (2ND SHIFT) 08/22/2021 06/30/2022** $62.930 A $10.850 $13.370 $0.000 B $1.610 $0.430 8.0 C $89.190 $120.660 $120.660 D $152.120 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (3RD SHIFT) 08/22/2021 06/30/2022** $65.660 A $10.850 $13.370 $0.000 B $1.610 $0.430 8.0 C $91.920 $124.750 $124.750 D $157.580 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (2ND SHIFT) 02/22/2022 04/30/2022** $53.690 A $10.850 $10.870 $3.000 E $0.800 $2.040 F 8.0 C $81.250 $109.600 G $109.600 G $137.940 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (3RD SHIFT) 02/22/2022 04/30/2022** $56.270 A $10.850 $10.870 $3.000 E $0.800 $2.040 F 8.0 C $83.830 $113.470 G $113.470 G $143.100 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICK TENDER BRICK TENDER (SPECIAL SINGLE SHIFT) 08/22/2021 06/30/2022** $41.490 H $9.300 $12.930 $0.000 B $0.450 $0.300 8.0 $64.470 $85.220 I $85.220 I $105.960 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#CARPET, LINOLEUM, SOFT FLOOR LAYER (SPECIAL SHIFT) 02/22/2022 06/30/2022* $63.850 A $10.700 $20.030 $0.000 J $1.050 $0.340 8.0 $95.970 $159.820 $159.820 $159.820 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM INSTALLER, SECOND SHIFT 02/22/2022 11/30/2022* $56.220 $12.400 $9.150 K $0.000 $1.100 $0.260 L 8.0 $81.100 $110.190 M $110.190 M $139.280 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM INSTALLER, THIRD SHIFT 02/22/2022 11/30/2022* $62.980 $12.400 $9.150 K $0.000 $1.100 $0.260 L 8.0 $88.090 $120.680 M $120.680 M $153.270 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM TECH., SECOND SHIFT 02/22/2022 11/30/2022* $64.660 $12.400 $9.150 K $0.000 $1.100 $0.260 L 8.0 $89.830 $123.290 M $123.290 M $156.750 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM TECH., THIRD SHIFT 02/22/2022 11/30/2022* $72.430 $12.400 $9.150 K $0.000 $1.100 $0.260 L 8.0 $97.870 $135.350 M $135.350 M $172.840 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: INSIDE WIREMAN, 2ND SHIFT 02/22/2022 05/31/2022** $74.270 $19.160 $21.190 O $0.000 B $2.330 $1.470 P 7.5 Q $120.650 $159.290 $197.930 R $197.930 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: INSIDE WIREMAN, 3RD SHIFT 02/22/2022 05/31/2022** $83.190 $20.530 $22.710 O $0.000 B $2.500 $1.610 P 7.0 S $133.040 $176.320 $219.590 R $219.590 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: CABLE SPLICER-WELDER, 2ND SHIFT 02/22/2022 05/31/2022** $85.410 $19.160 $21.190 O $0.000 B $2.330 $1.590 P 7.5 Q $132.240 $176.680 $221.110 R $221.110 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: CABLE SPLICER-WELDER, 3RD SHIFT 02/22/2022 05/31/2022** $95.670 $20.530 $22.710 O $0.000 B $2.500 $1.740 P 7.0 S $146.020 $195.790 $245.560 R $245.560 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#FIELD SURVEYOR: CHIEF OF PARTY (NIGHT SHIFT) T 02/22/2022 02/28/2023** $59.180 $13.380 $13.010 U $4.900 V $1.260 $0.190 8.0 $91.920 $121.510 W $121.510 W $151.100 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#FIELD SURVEYOR: INSTRUMENTMAN (NIGHT SHIFT) T 02/22/2022 02/28/2023** $55.140 $13.380 $13.010 U $4.900 V $1.260 $0.190 8.0 $87.880 $115.450 W $115.450 W $143.020 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#FIELD SURVEYOR: CHAINMAN/RODMAN (NIGHT SHIFT) T 02/22/2022 02/28/2023** $51.900 $13.380 $13.010 U $4.900 V $1.260 $0.190 8.0 $84.640 $110.590 W $110.590 W $136.540 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#GLAZIER GLAZIER (SPECIAL SHIFT) X 02/22/2022 12/31/2022** $60.200 A $10.700 $19.650 Y $0.000 $1.100 $0.480 Z 7.5 Q $92.130 $152.330 $152.330 $152.330 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#MARBLE FINISHER MARBLE FINISHER (2ND SHIFT) AA 08/22/2021 07/31/2022** $42.720 AB $10.850 $5.780 $0.000 J $0.450 $0.890 8.0 $60.690 $82.050 AC $103.410 $103.410 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#MARBLE MASON MARBLE MASON (2ND SHIFT) AA 08/22/2021 07/31/2022** $59.170 AB $10.850 $16.620 $0.000 J $0.800 $1.220 8.0 $88.660 $118.240 AC $147.830 $147.830 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PAINTER PAINTER (SPECIAL SHIFT) AD 02/22/2022 12/31/2022** $53.280 H $10.700 $14.670 U $0.000 J $0.960 $0.380 8.0 C $79.990 $106.630 AE $106.630 AE $133.270 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PAINTER INDUSTRIAL PAINTER (SPECIAL SHIFT) AF 02/22/2022 12/31/2022** $55.580 H $10.700 $14.670 U $0.000 J $0.960 $0.380 8.0 C $82.290 $110.080 AE $110.080 AE $137.870 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PAINTER BRIDGE PAINTER (SPECIAL SHIFT) AG 02/22/2022 12/31/2022** $57.880 H $10.700 $14.670 U $0.000 J $0.960 $0.380 8.0 C $84.590 $113.530 AE $113.530 AE $142.470 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PAINTER: TAPER (SPECIAL SHIFT) 02/22/2022 06/30/2022* $62.920 AH $10.700 $17.890 $0.000 J $1.050 $0.660 8.0 $93.220 $124.680 AI $124.680 AI $156.140 AJ HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PLASTERER PLASTERER: 2ND SHIFT 02/22/2022 06/30/2022** $46.540 AK $14.030 $17.990 $0.000 B $1.280 $1.250 7.0 AL $81.090 $101.310 AM $101.310 AN $121.530 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PLASTERER PLASTERER: 3RD SHIFT 02/22/2022 06/30/2022** $47.540 AK $14.030 $17.990 $0.000 B $1.280 $1.250 7.0 AL $82.090 $102.810 AM $102.810 AN $123.530 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SHEET METAL WORKER (SPECIAL SHIFT) 08/22/2021 07/03/2022* $74.270 H $14.850 AO $30.990 AP $0.000 B $1.530 $0.710 8.0 $122.350 $163.170 AQ $163.170 AQ $203.990 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SHEET METAL WORKER (2ND SHIFT) 08/22/2021 07/03/2022* $72.940 H $14.850 AO $30.990 AP $0.000 B $1.530 $0.710 7.5 AR $121.020 $161.180 AQ $161.180 AQ $201.330 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SHEET METAL WORKER (3RD SHIFT) 08/22/2021 07/03/2022* $76.260 H $14.850 AO $30.990 AP $0.000 B $1.530 $0.710 7.0 AS $124.340 $166.160 AQ $166.160 AQ $207.970 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS (SPECIAL SHIFT) 08/22/2021 07/03/2022* $64.670 H $14.850 AO $29.380 AP $0.000 B $1.530 $0.710 8.0 $111.140 $146.690 AQ $146.690 AQ $182.230 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS (2ND SHIFT) 08/22/2021 07/03/2022* $63.510 H $14.850 AO $29.380 AP $0.000 B $1.530 $0.710 7.5 AR $109.980 $144.950 AQ $144.950 AQ $179.910 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS (3RD SHIFT) 08/22/2021 07/03/2022* $66.400 H $14.850 AO $29.380 AP $0.000 B $1.530 $0.710 7.0 AS $112.870 $149.280 AQ $149.280 AQ $185.690 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (SPECIAL SHIFT) 08/22/2021 07/03/2022* $50.920 H $14.250 AT $16.070 AP $0.000 B $1.430 $0.710 8.0 $83.380 $110.090 AU $110.090 AU $136.800 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (2ND SHIFT) 08/22/2021 07/03/2022* $50.010 H $14.250 AT $16.070 AP $0.000 B $1.430 $0.710 7.5 AR $82.470 $108.730 AU $108.730 AU $134.980 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (3RD SHIFT) 08/22/2021 07/03/2022* $52.280 H $14.250 AT $16.070 AP $0.000 B $1.430 $0.710 7.0 AS $84.740 $112.130 AU $112.130 AU $139.520 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (SPECIAL SHIFT) 08/22/2021 07/03/2022* $46.080 H $14.250 AT $10.580 AP $0.000 B $1.430 $0.710 8.0 $73.050 $96.890 AU $96.890 AU $120.730 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (2ND SHIFT) 08/22/2021 07/03/2022* $45.250 H $14.250 AT $10.580 AP $0.000 B $1.430 $0.710 7.5 AR $72.220 $95.650 AU $95.650 AU $119.070 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (3RD SHIFT) 08/22/2021 07/03/2022* $47.310 H $14.250 AT $10.580 AP $0.000 B $1.430 $0.710 7.0 AS $74.280 $98.740 AU $98.740 AU $123.190 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (SPECIAL SHIFT) 08/22/2021 07/03/2022* $40.390 H $14.250 AT $5.110 AP $0.000 B $1.410 $0.710 8.0 $61.870 $82.630 AQ $82.630 AQ $103.380 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (2ND SHIFT) 08/22/2021 07/03/2022* $39.670 H $14.250 AT $5.110 AP $0.000 B $1.410 $0.710 7.5 AR $61.150 $81.550 AQ $81.550 AQ $101.940 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (3RD SHIFT) 08/22/2021 07/03/2022* $41.470 H $14.250 AT $5.110 AP $0.000 B $1.410 $0.710 7.0 AS $62.950 $84.250 AQ $84.250 AQ $105.540 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (SPECIAL SHIFT) 08/22/2021 07/03/2022* $47.420 H $14.250 AO $10.900 AP $0.000 B $1.410 $0.710 8.0 $74.690 $99.150 AQ $99.150 AQ $123.610 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (2ND SHIFT) 08/22/2021 07/03/2022* $46.570 H $14.250 AO $10.900 AP $0.000 B $1.410 $0.710 7.5 AR $73.840 $97.880 AQ $97.880 AQ $121.910 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) (3RD SHIFT) 08/22/2021 07/03/2022* $48.690 H $14.250 AO $10.900 AP $0.000 B $1.410 $0.710 7.0 AS $75.960 $101.060 AQ $101.060 AQ $126.150 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO FINISHER TERRAZZO FINISHER, 2ND SHIFT AV 08/22/2021 06/30/2022* $44.950 AW $10.850 $6.220 $0.000 B $0.800 $1.020 8.0 $63.840 $83.940 AQ $83.940 AQ $104.050 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO FINISHER TERRAZZO FINISHER, 3RD SHIFT AV 08/22/2021 06/30/2022* $44.950 AW $10.850 $6.220 $0.000 B $0.800 $1.020 8.0 $63.840 $83.940 AQ $83.940 AQ $104.050 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO WORKER TERRAZZO WORKER, 2ND SHIFT AV 08/22/2021 06/30/2022* $61.030 AW $10.850 $15.870 $0.000 B $0.800 $1.250 8.0 $89.800 $117.180 AQ $117.180 AQ $144.570 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO WORKER TERRAZZO WORKER, 3RD SHIFT AV 08/22/2021 06/30/2022* $61.030 AW $10.850 $15.870 $0.000 B $0.800 $1.250 8.0 $89.800 $117.180 AQ $117.180 AQ $144.570 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TILE FINISHER TILE FINISHER, 2ND SHIFT 08/22/2021 03/31/2022* $35.840 AX $10.510 $5.550 $1.000 $0.820 $1.270 8.0 $54.990 $70.410 $70.410 C $85.830 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TILE FINISHER TILE FINISHER - RED CIRCLED FINISHER, 2ND SHIFT 08/22/2021 03/31/2022* $41.720 AX $10.510 $6.330 $1.500 $0.820 $1.340 8.0 $62.220 $80.580 $80.580 C $98.940 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TILE SETTER TILE SETTER, 2ND SHIFT 08/22/2021 03/31/2022* $56.560 AX $10.510 $8.050 $2.500 $1.170 $2.020 8.0 $80.810 $106.090 $106.090 C $131.370 HolidaysScope of WorkTravel & Subsistence Shift Provisions

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
E
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
F
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY COUNCIL.
G
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
J
INCLUDED IN BASIC HOURLY RATE.
K
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
L
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
M
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
N
DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
O
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
P
INCLUDES AN AMOUNT (1.05% OF THE BASIC HOURLY RATE) FOR THE CONTRACT ADMINISTRATION FUND, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.
Q
8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE
R
DISREGARD THIS RATE. USE THE SATURDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
S
8 HOURS PAY FOR 7 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE.
T
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
U
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
V
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
W
RATE APPLIES TO DAILY OVERTIME HOURS UP TO AND INCLUDING 12 HOURS WORKED, SUNDAY NIGHT THROUGH THURSDAY NIGHT, OR OTHER OVERTIME HOURS BEYOND 40 HOURS IN A WORKWEEK. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY SHIFT DIFFERENTIAL RATE. IN THE EVENT THAT THERE ARE LESS THAN 40 HOURS WORKED SUNDAY THROUGH THURSDAY, THEN THE BALANCE OF HOURS WORKED UP TO AND INCLUDING 40 HOURS FOR THE WORKWEEK, OR UP TO 8 HOURS FOR THE WORKDAY, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME SHIFT DIFFERENTIAL RATE.
X
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
Y
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
Z
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
AA
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
AB
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AC
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AD
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($2.00 PER HOUR), EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AE
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AF
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AG
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AH
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AI
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AJ
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AK
INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME.EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE
AL
8 HOURS PAY FOR 7 HOURS WORKED AT STRAIGHT-TIME BASIC HOURLY RATE.
AM
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AN
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER
AO
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AP
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AQ
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AR
8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7.5 HOURS WORKED
AS
8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7 HOURS WORKED
AT
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AU
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AV
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AW
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AX
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES AN AMOUNT OF PREMIUM RATE PER HOUR ABOVE THE REGULAR STRAIGHT-TIME RATE, WHICH IS NOT FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page