GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SANTA CLARA COUNTY

DETERMINATION: STC-2020-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS SHIFT PROVISIONS
#BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (2ND SHIFT) 08/22/2020 06/30/2021** $60.660 A $10.750 $12.970 $0.000 B $1.580 $0.430 8 C $86.390 $116.720 $116.720 D $147.050 HolidaysScope of WorkTravel & SubsistenceShift
BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (3RD SHIFT) 08/22/2020 06/30/2021** $63.300 A $10.750 $12.970 $0.000 B $1.580 $0.430 8 C $89.030 $120.680 $120.680 D $152.330 HolidaysScope of WorkTravel & SubsistenceShift
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (2ND SHIFT) 08/22/2020 04/30/2021** $51.360 A $10.750 $10.420 $3.000 E $0.800 $1.860 F 8 C $78.190 $105.370 G $105.370 G $132.550 HolidaysScope of WorkTravel & SubsistenceShift
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (3RD SHIFT) 08/22/2020 04/30/2021** $53.830 A $10.750 $10.420 $3.000 E $0.800 $1.860 F 8 C $80.660 $109.070 G $109.070 G $137.490 HolidaysScope of WorkTravel & SubsistenceShift
#BRICK TENDER BRICK TENDER (SPECIAL SINGLE SHIFT) 08/22/2020 06/30/2021** $38.180 H $9.000 $11.770 $0.000 B $0.450 $0.300 8 $59.700 $78.790 I $78.790 I $97.880 HolidaysScope of WorkTravel & SubsistenceShift
#ELECTRICIAN: COMM & SYSTEM INSTALLER, SECOND SHIFT 02/22/2020 11/30/2020** $50.360 $11.550 $7.150 J $0.000 $1.100 $0.260 K 8 $72.180 $98.240 L $98.240 L $124.300 M HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: COMM & SYSTEM INSTALLER, THIRD SHIFT 02/22/2020 11/30/2020** $56.410 $11.550 $7.150 J $0.000 $1.100 $0.260 K 8 $78.440 $107.630 L $107.630 L $136.820 M HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: COMM & SYSTEM TECH., SECOND SHIFT 02/22/2020 11/30/2020** $57.910 $11.550 $7.150 J $0.000 $1.100 $0.260 K 8 $80.000 $109.970 L $109.970 L $139.930 M HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: COMM & SYSTEM TECH., THIRD SHIFT 02/22/2020 11/30/2020** $64.870 $11.550 $7.150 J $0.000 $1.100 $0.260 K 8 $87.200 $120.760 L $120.760 L $154.330 M HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN SECOND SHIFT N 08/22/2020 05/31/2021* $83.390 O $15.800 $20.900 P $0.000 $1.500 $0.660 Q 8 $124.750 $167.700 R $167.700 R $210.640 S HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN THIRD SHIFT N 08/22/2020 05/31/2021* $93.980 O $15.800 $20.900 P $0.000 $1.500 $0.710 Q 8 $135.710 $184.110 R $184.110 R $232.510 S HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: CABLE SPLICER, 2ND SHIFT N 08/22/2020 05/31/2021* $96.480 O $15.800 $20.900 P $0.000 $1.500 $0.720 Q 8 $138.290 $187.980 R $187.980 R $237.670 S HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: CABLE SPLICER, 3RD SHIFT N 08/22/2020 05/31/2021* $108.080 O $15.800 $20.900 P $0.000 $1.500 $0.780 Q 8 $150.300 $205.960 R $205.960 R $261.620 S HolidaysScope of WorkTravel & SubsistenceShift
#FIELD SURVEYOR: CHIEF OF PARTY (NIGHT SHIFT) T 02/22/2020 02/28/2021* $52.910 $13.880 $12.010 U $4.790 V $1.160 $0.210 7 $84.960 $111.410 W $111.410 X $137.870 M HolidaysScope of WorkTravel & SubsistenceShift
FIELD SURVEYOR: INSTRUMENTMAN (NIGHT SHIFT) T 02/22/2020 02/28/2021* $49.430 $13.880 $12.010 U $4.790 V $1.160 $0.210 7 $81.480 $106.200 W $106.200 X $130.910 M HolidaysScope of WorkTravel & SubsistenceShift
FIELD SURVEYOR: CHAINMAN/RODMAN (NIGHT SHIFT) T 02/22/2020 02/28/2021* $46.190 $13.880 $12.010 U $4.790 V $1.160 $0.210 7 $78.240 $101.330 W $101.330 X $124.430 M HolidaysScope of WorkTravel & SubsistenceShift
#MARBLE FINISHER MARBLE FINISHER (2ND SHIFT) Y 08/22/2020 07/31/2021** $41.530 Z $10.750 $5.340 $0.000 AA $0.450 $0.870 8 $58.940 $79.710 AB $100.470 $100.470 HolidaysScope of WorkTravel & SubsistenceShift
#MARBLE MASON MARBLE MASON (2ND SHIFT) Y 08/22/2020 07/31/2021** $57.300 Z $10.750 $16.120 $0.000 AA $0.800 $1.190 8 $86.160 $114.810 AB $143.460 $143.460 HolidaysScope of WorkTravel & SubsistenceShift
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC)(2ND SHIFT) 08/22/2020 06/30/2021* $76.660 A $16.960 AC $25.420 AD $0.000 B $1.950 $0.900 AE 7.5 AF $121.890 $164.970 G $164.970 G $208.050 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC)(3RD SHIFT) 08/22/2020 06/30/2021* $76.660 A $16.960 AC $25.420 AD $0.000 B $1.950 $0.900 AE 7 AG $121.890 $164.970 G $164.970 G $208.050 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 2)(2ND SHIFT) 08/22/2020 06/30/2021* $26.430 A $10.700 AH $0.500 AH $0.000 B $0.000 $0.250 AI 7.5 AF $37.880 $51.100 G $51.100 G $64.310 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 2)(3RD SHIFT) 08/22/2020 06/30/2021* $26.430 A $10.700 AH $0.500 AH $0.000 B $0.000 $0.250 AI 7 AG $37.880 $51.100 G $51.100 G $64.310 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 3)(2ND SHIFT) 08/22/2020 06/30/2021* $32.870 A $10.700 AH $0.500 AH $0.000 B $0.000 $0.250 AI 7.5 AF $44.320 $60.760 G $60.760 G $77.190 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 3)(3RD SHIFT) 08/22/2020 06/30/2021* $32.870 A $10.700 AH $0.500 AH $0.000 B $0.000 $0.250 AI 7 AG $44.320 $60.760 G $60.760 G $77.190 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 4)(2ND SHIFT) 08/22/2020 06/30/2021* $34.450 A $10.700 AH $0.500 AH $0.000 B $0.000 $0.250 AI 7.5 AF $45.900 $63.130 G $63.130 G $80.350 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 4)(3RD SHIFT) 08/22/2020 06/30/2021* $34.450 A $10.700 AH $0.500 AH $0.000 B $0.000 $0.250 AI 7 AG $45.900 $63.130 G $63.130 G $80.350 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 5)(2ND SHIFT) 08/22/2020 06/30/2021* $37.890 A $10.700 AH $2.250 AH $0.000 B $0.000 $0.250 AI 7.5 AF $51.090 $70.030 G $70.030 G $88.980 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 5)(3RD SHIFT) 08/22/2020 06/30/2021* $37.890 A $10.700 AH $2.250 AH $0.000 B $0.000 $0.250 AI 7 AG $51.090 $70.030 G $70.030 G $88.980 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: SERVICE AND REPAIR (2ND SHIFT) 08/22/2020 06/30/2021* $76.660 A $16.960 AC $25.420 AD $0.000 B $1.950 $0.900 AE 7.5 AF $121.890 $164.970 $164.970 AJ $164.970 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: SERVICE AND REPAIR (3RD SHIFT) 08/22/2020 06/30/2021* $76.660 A $16.960 AC $25.420 AD $0.000 B $1.950 $0.900 AE 7 AG $121.890 $164.970 $164.970 AJ $164.970 HolidaysScope of WorkTravel & SubsistenceShift
#SHEET METAL WORKER SHEET METAL WORKER (SPECIAL SHIFT) 08/22/2020 06/27/2021** $71.750 H $14.850 AK $29.740 AL $0.000 B $1.530 $0.710 8 $118.580 $158.010 AM $158.010 AM $197.450 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SHEET METAL WORKER (2ND SHIFT) 08/22/2020 06/27/2021** $70.470 H $14.850 AK $29.740 AL $0.000 B $1.530 $0.710 7.5 AF $117.300 $156.100 AM $156.100 AM $194.890 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SHEET METAL WORKER (3RD SHIFT) 08/22/2020 06/27/2021** $73.670 H $14.850 AK $29.740 AL $0.000 B $1.530 $0.710 7 AG $120.500 $160.890 AM $160.890 AM $201.290 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (SPECIAL SHIFT) 08/22/2020 06/27/2021** $62.630 H $14.850 AK $28.200 AL $0.000 B $1.530 $0.710 8 $107.920 $142.340 AM $142.340 AM $176.760 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (2ND SHIFT) 08/22/2020 06/27/2021** $61.510 H $14.850 AK $28.200 AL $0.000 B $1.530 $0.710 7.5 AF $106.800 $140.670 AM $140.670 AM $174.520 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (3RD SHIFT) 08/22/2020 06/27/2021** $64.310 H $14.850 AK $28.200 AL $0.000 B $1.530 $0.710 7 AG $109.600 $144.870 AM $144.870 AM $180.120 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2020 06/27/2021** $49.220 H $14.250 AN $15.480 AL $0.000 B $1.430 $0.710 8 $81.090 $106.960 AO $106.960 AO $132.810 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2020 06/27/2021** $48.350 H $14.250 AN $15.480 AL $0.000 B $1.430 $0.710 7.5 AF $80.220 $105.660 AO $105.660 AO $131.070 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2020 06/27/2021** $50.540 H $14.250 AN $15.480 AL $0.000 B $1.430 $0.710 7 AG $82.410 $108.940 AO $108.940 AO $135.450 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2020 06/27/2021** $44.330 H $14.250 AN $10.210 AL $0.000 B $1.430 $0.710 8 $70.930 $93.900 AO $93.900 AO $116.860 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2020 06/27/2021** $43.540 H $14.250 AN $10.210 AL $0.000 B $1.430 $0.710 7.5 AF $70.140 $92.710 AO $92.710 AO $115.280 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2020 06/27/2021** $45.520 H $14.250 AN $10.210 AL $0.000 B $1.430 $0.710 7 AG $72.120 $95.680 AO $95.680 AO $119.240 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2020 06/27/2021** $38.840 H $14.250 AN $4.910 AL $0.000 B $1.410 $0.710 8 $60.120 $80.080 AM $80.080 AM $100.040 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2020 06/27/2021** $38.150 H $14.250 AN $4.910 AL $0.000 B $1.410 $0.710 7.5 AF $59.430 $79.050 AM $79.050 AM $98.660 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2020 06/27/2021** $39.880 H $14.250 AN $4.910 AL $0.000 B $1.410 $0.710 7 AG $61.160 $81.650 AM $81.650 AM $102.120 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2020 06/27/2021** $45.720 H $14.250 AK $10.490 AL $0.000 B $1.410 $0.710 8 $72.580 $96.190 AM $96.190 AM $119.800 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2020 06/27/2021** $44.900 H $14.250 AK $10.490 AL $0.000 B $1.410 $0.710 7.5 AF $71.760 $94.960 AM $94.960 AM $118.160 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2020 06/27/2021** $46.940 H $14.250 AK $10.490 AL $0.000 B $1.410 $0.710 7 AG $73.800 $98.020 AM $98.020 AM $122.240 HolidaysScope of WorkTravel & SubsistenceShift
#TERRAZZO FINISHER TERRAZZO FINISHER, 2ND SHIFT AP 08/22/2020 06/30/2021** $43.670 AQ $10.750 $5.870 $0.000 B $0.800 $1.000 8 $62.090 $81.590 AM $81.590 AM $101.090 HolidaysScope of WorkTravel & SubsistenceShift
TERRAZZO FINISHER TERRAZZO FINISHER, 3RD SHIFT AP 08/22/2020 06/30/2021** $43.670 AQ $10.750 $5.870 $0.000 B $0.800 $1.000 8 $62.090 $81.590 AM $81.590 AM $101.090 HolidaysScope of WorkTravel & SubsistenceShift
#TERRAZZO WORKER TERRAZZO WORKER, 2ND SHIFT AP 08/22/2020 06/30/2021** $58.660 AQ $10.750 $15.370 $0.000 B $0.800 $1.220 8 $86.800 $113.050 AM $113.050 AM $139.300 HolidaysScope of WorkTravel & SubsistenceShift
TERRAZZO WORKER TERRAZZO WORKER, 3RD SHIFT AP 08/22/2020 06/30/2021** $58.660 AQ $10.750 $15.370 $0.000 B $0.800 $1.220 8 $86.800 $113.050 AM $113.050 AM $139.300 HolidaysScope of WorkTravel & SubsistenceShift
#TILE FINISHER TILE FINISHER, 2ND SHIFT 08/22/2020 03/31/2021* $35.220 AR $10.310 $5.300 $1.000 $0.820 $1.060 8 $53.710 $68.820 $68.820 C $83.930 HolidaysScope of WorkTravel & SubsistenceShift
TILE FINISHER TILE FINISHER - RED CIRCLED FINISHER, 2ND SHIFT 08/22/2020 03/31/2021* $41.100 AR $10.310 $6.080 $1.500 $0.820 $1.130 8 $60.940 $78.990 $78.990 C $97.040 HolidaysScope of WorkTravel & SubsistenceShift
#TILE SETTER TILE SETTER, 2ND SHIFT 08/22/2020 03/31/2021* $55.530 AR $10.310 $7.800 $2.500 $1.170 $1.750 8 $79.060 $103.820 $103.820 C $128.590 HolidaysScope of WorkTravel & SubsistenceShift

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
E
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
F
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
G
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
J
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
K
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
L
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
M
DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
N
FOR SHIFT RATES ON OCCUPIED REMODEL AND RENOVATION WORK, PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415)703-4774.
O
INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
P
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
Q
INCLUDES AMOUNT EQUAL TO 0.5% OF THE HOURLY RATE FOR THE ADMINISTRATIVE MAINTENANCE FUND AND THE REMAINING AMOUNT IS FOR THE JOINT ELECTRICAL INDUSTRY FUND.
R
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS UP TO A MAXIMUM OF 10 HOURS IN ANY ONE WEEK OR THE FIRST 8 HOURS WORKED ON SATURDAY IF NO OVERTIME HAS BEEN WORKED DURING THE WEEK. IF OVERTIME IS WORKED MONDAY THROUGH FRIDAY, SUBTRACT THAT AMOUNT OF TIME FROM THE TIME ALLOWED AT TIME AND ONE HALF (1 1/2) ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
S
DISREGARD THIS RATE. FOR ALL HOURS IN EXCESS OF THE FIRST EIGHT HOURS OF WORK PERFORMED ON SATURDAY AND FOR ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS, USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
T
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
U
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
V
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
W
DISREGARD THIS RATE. FOR THE FIRST 4 DAILY OVERTIME HOURS, SUNDAY NIGHT THROUGH THURSDAY NIGHT, USE THE DAILY OVERTIME NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION. ALL OTHER OVERTIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 35 HOURS OF WORK ON A 7 HOUR DAY, SUNDAY NIGHT THROUGH THURSDAY NIGHT, THE BALANCE OF THE 35 HOURS, UP TO 7 HOURS, MAY BE WORKED ON FRIDAY NIGHT AT THE STRAIGHT-TIME RATE.
X
DISREGARD THIS RATE. FOR THE FIRST 12 HOURS OF WORK ON SATURDAY, USE THE SATURDAY NON-SHIFT DIFFERENTIAL RATE. FOR ALL HOURS AFTER THE FIRST 12 HOURS WORKED ON SATURDAY, USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE.
Y
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
Z
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AA
INCLUDED IN BASIC HOURLY RATE.
AB
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AC
INCLUDES AN AMOUNT FOR HEALTH AND WELFARE EXTENDED RESERVE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AD
INCLUDES AN AMOUNT FOR 401A-PART B PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AE
$0.50 TO SUPPLEMENTAL UNEMPLOYMENT.
AF
8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7.5 HOURS WORKED
AG
8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7 HOURS WORKED
AH
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AI
AMOUNT IS FOR CONTRACT ADMINISTRATION
AJ
SATURDAY MAY BE PAID AT STRAIGHT TIME IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY.
AK
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AL
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AM
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AN
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AO
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AP
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AQ
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AR
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES AN AMOUNT OF PREMIUM RATE PER HOUR ABOVE THE REGULAR STRAIGHT-TIME RATE, WHICH IS NOT FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page