GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
LOCALITY: SANTA CLARA COUNTY
DETERMINATION: STC-2019-2
CRAFT | CLASSIFICATION | CRAFT FOOTNOTE | ISSUE DATE | EXPIRATION DATE | DATE OF NEXT INCREASE 1 | AMOUNT OF INCREASE 1 | INCREASE FOOTNOTE 1 | DATE OF NEXT INCREASE 2 | AMOUNT OF INCREASE 2 | INCREASE FOOTNOTE 2 | DATE OF NEXT INCREASE 3 | AMOUNT OF INCREASE 3 | INCREASE FOOTNOTE 3 | DATE OF NEXT INCREASE 4 | AMOUNT OF INCREASE 4 | INCREASE FOOTNOTE 4 | DATE OF NEXT INCREASE 5 | AMOUNT OF INCREASE 5 | INCREASE FOOTNOTE 5 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
BRICKLAYER, BLOCKLAYER: | BRICKLAYER, BLOCKLAYER, STONEMASON | 08/22/2019 | 04/30/2020** | 05/01/2020 | $2.500 | A | 05/01/2021 | $2.850 | A | ||||||||||
BRICKLAYER, BLOCKLAYER: | POINTER, CLEANER, CAULKER, WATERPROOFER | 08/22/2019 | 06/30/2020** | 07/01/2020 | $2.500 | A | 07/01/2021 | $2.500 | A | 07/01/2022 | $2.500 | A | |||||||
BRICK TENDER | 08/22/2019 | 06/30/2020** | 07/01/2020 | $2.390 | A | 07/01/2021 | $2.400 | A | 07/01/2022 | $2.000 | A | ||||||||
ELECTRICIAN: | INSIDE WIREMAN, TECHNICIAN | 08/22/2019 | 05/31/2020** | 06/01/2020 | $3.000 | A | |||||||||||||
ELECTRICIAN: | CABLE SPLICER | 08/22/2019 | 05/31/2020** | 06/01/2020 | $3.000 | A | |||||||||||||
ELECTRICIAN: | MATERIAL HANDLER | B | 08/22/2019 | 07/31/2020** | 08/01/2020 | $2.500 | A | ||||||||||||
ELECTRICIAN: | MATERIAL HANDLER - FOURTH SIX MONTHS | B | 08/22/2019 | 07/31/2020** | 08/01/2020 | $2.120 | A | ||||||||||||
ELECTRICIAN: | MATERIAL HANDLER - THIRD SIX MONTHS | B | 08/22/2019 | 07/31/2020** | 08/01/2020 | $1.870 | A | ||||||||||||
ELECTRICIAN: | MATERIAL HANDLER - SECOND SIX MONTHS | B | 08/22/2019 | 07/31/2020** | 08/01/2020 | $1.620 | A | ||||||||||||
FIELD SURVEYOR: | CHIEF OF PARTY | C | 02/22/2019 | 02/29/2020** | 03/01/2020 | $3.000 | A | ||||||||||||
FIELD SURVEYOR: | INSTRUMENTMAN | C | 02/22/2019 | 02/29/2020** | 03/01/2020 | $3.000 | A | ||||||||||||
FIELD SURVEYOR: | CHAINMAN/RODMAN | C | 02/22/2019 | 02/29/2020** | 03/01/2020 | $3.000 | A | ||||||||||||
GLAZIER | D | 08/22/2019 | 12/31/2019** | 01/01/2020 | $1.500 | E | 07/01/2020 | $1.500 | A | 01/01/2021 | $1.500 | A | |||||||
PAINTER: | BRUSH AND SPRAY | F | 02/22/2019 | 12/31/2019** | 01/01/2020 | $2.000 | A | ||||||||||||
PAINTER: | METALIZING AND THERMAL SPRAY | F | 02/22/2019 | 12/31/2019** | 01/01/2020 | $3.000 | G | ||||||||||||
PAINTER: | INDUSTRIAL PAINTER | H | 02/22/2019 | 12/31/2019** | 01/01/2020 | $2.250 | I | ||||||||||||
PAINTER: | SANDBLASTER, STEAM CLEANER, WATERBLASTER | F | 02/22/2019 | 12/31/2019** | 01/01/2020 | $2.000 | A | ||||||||||||
PAINTER: | EXOTIC MATERIALS | F | 02/22/2019 | 12/31/2019** | 01/01/2020 | $2.000 | A | ||||||||||||
PAINTER: | PAPERHANGER, WALLCOVERING, LEAD ABATEMENT | F | 02/22/2019 | 12/31/2019** | 01/01/2020 | $2.000 | A | ||||||||||||
PAINTER: | TAPER | 02/22/2019 | 12/31/2019** | 01/01/2020 | $2.500 | A | 01/01/2021 | $2.750 | A | 07/01/2021 | $2.750 | A | |||||||
PLASTERER | 08/22/2019 | 12/31/2019** | 01/01/2020 | $0.980 | A | 07/01/2020 | $3.730 | A | |||||||||||
PLASTER TENDER | 08/22/2019 | 06/30/2020** | 07/01/2020 | $2.750 | A | 07/01/2021 | $2.750 | A | 07/01/2022 | $2.750 | A | ||||||||
PLUMBER: | UNDERGROUND UTILITY PIPEFITTER | 08/22/2019 | 06/30/2020** | 07/01/2020 | $1.500 | J | 07/01/2021 | $1.500 | J | ||||||||||
PLUMBER: | LANDSCAPE PIPEFITTER | 08/22/2019 | 06/30/2020** | 07/01/2020 | $1.500 | J | 07/01/2021 | $1.500 | J | ||||||||||
PLUMBER: | UNDERGROUND UTILITY ASSISTANT JOURNEYMAN | K | 08/22/2019 | 06/30/2020** | 07/01/2020 | $1.000 | L | 07/01/2021 | $1.000 | L | |||||||||
PLUMBER: | LANDSCAPE ASSISTANT JOURNEYMAN | M | 08/22/2019 | 06/30/2020** | 07/01/2020 | $1.000 | L | 07/01/2021 | $1.000 | L | |||||||||
PLUMBER: | UNDERGROUND UTILITY TRADESMAN | N | 08/22/2019 | 06/30/2020** | 07/01/2020 | $1.000 | L | 07/01/2021 | $1.000 | L | |||||||||
PLUMBER: | LANDSCAPE TRADESMAN I | O | 08/22/2019 | 06/30/2020** | 07/01/2020 | $1.000 | L | 07/01/2021 | $1.000 | L | |||||||||
PLUMBER: | LANDSCAPE TRADESMAN II | O | 08/22/2019 | 06/30/2020** | 07/01/2020 | $1.000 | L | 07/01/2021 | $1.000 | L | |||||||||
PLUMBER: | PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) | 08/22/2019 | 06/30/2020** | 07/01/2020 | $3.500 | A | |||||||||||||
PLUMBER: | SERVICE AND REPAIR | 08/22/2019 | 06/30/2020** | 07/01/2020 | $3.500 | A | |||||||||||||
PLUMBER: | SPRINKLER FITTER (FIRE PROTECTION AND FIRE CONTROL SYSTEMS) | 08/22/2019 | 12/31/2019** | 01/01/2020 | $0.140 | P | 08/03/2020 | $3.500 | A | 08/02/2021 | $3.500 | A | 08/01/2022 | $3.500 | A | 07/31/2023 | $3.500 | A | |
ROOFER | ROOFER, KETTLEMAN | 08/22/2019 | 07/31/2020** | 08/01/2020 | $3.250 | A | |||||||||||||
ROOFER | HELPER | 08/22/2019 | 07/31/2020** | 08/01/2020 | $2.930 | A | |||||||||||||
ROOFER | KETTLEMAN (2 KETTLES) | 08/22/2019 | 07/31/2020** | 08/01/2020 | $3.250 | A | |||||||||||||
ROOFER | BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER | 08/22/2019 | 07/31/2020** | 08/01/2020 | $3.250 | A | |||||||||||||
SHEET METAL WORKER | 08/22/2019 | 06/28/2020** | 06/29/2020 | $3.250 | A | 06/28/2021 | $3.500 | A | |||||||||||
SHEET METAL WORKER | TOTAL SHEET METAL CONTRACT OF $200000 OR LESS | 08/22/2019 | 06/28/2020** | 06/29/2020 | $2.750 | A | 06/28/2021 | $3.000 | A | ||||||||||
SHEET METAL WORKER | SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) | 08/22/2019 | 06/28/2020** | 06/29/2020 | $1.950 | A | 06/28/2021 | $2.100 | A | ||||||||||
SHEET METAL WORKER | SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) | 08/22/2019 | 06/28/2020** | 06/29/2020 | $1.790 | A | 06/28/2021 | $1.930 | A | ||||||||||
SHEET METAL WORKER | AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) | 08/22/2019 | 06/28/2020** | 06/29/2020 | $1.460 | A | 06/28/2021 | $1.580 | A | ||||||||||
SHEET METAL WORKER | AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) | 08/22/2019 | 06/28/2020** | 06/29/2020 | $1.790 | A | 06/28/2021 | $1.930 | A | ||||||||||
TILE FINISHER | 08/22/2019 | 03/31/2020** | 04/01/2020 | $1.840 | A | ||||||||||||||
TILE FINISHER | RED CIRCLED FINISHER | 08/22/2019 | 03/31/2020** | 04/01/2020 | $1.840 | A | |||||||||||||
TILE SETTER | 08/22/2019 | 03/31/2020** | 04/01/2020 | $3.000 | A |
FOOTNOTES
- **
- THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
- A
- THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
- B
- THE MATERIAL HANDLER MAY BE UTILIZED IN CONJUNCTION WITH BOTH INSIDE AND LINE PROJECTS. THE RATIO OF MATERIAL HANDLER TO JOURNEYMEN SHALL BE ONE (1) MATERIAL HANDLER TO THREE (3) JOURNEYMEN.
- C
- ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
- D
- CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
- E
- $0.80 TO THE BASIC HOURLY RATE, $0.20 TO HEALTH AND WELFARE, AND $0.50 TO PENSION.
- F
- EMPLOYEES SHALL BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. EMPLOYEES SHALL BE ENTITLED TO $2.00 PER HOUR ABOVE THE BASIC HOURLY RATE WHEN PERFORMING WORK FROM OR TO A SUSPENDED PLATFORM SUCH AS SAFESPAN, QUICKDECK OR COMPARABLE PLATFORM SYSTEMS ON BRIDGE AND OVERPASS TYPE WORK.
- G
- $1.00 TO BASIC HOURLY RATE AND $2.00 TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
- H
- EMPLOYEES SHALL BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. EMPLOYEES SHALL BE ENTITLED TO $2.00 PER HOUR ABOVE THE BASIC HOURLY RATE WHEN PERFORMING WORK FROM OR TO A SUSPENDED PLATFORM SUCH AS SAFESPAN, QUICKDECK OR COMPARABLE PLATFORM SYSTEMS ON BRIDGE AND OVERPASS TYPE WORK.
- I
- $0.25 TO BASIC HOURLY RATE AND $2.00 TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
- J
- $1.00 TO BASIC HOURLY RATE AND $0.50 TO HEALTH AND WELFARE
- K
- THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
- L
- $0.50 TO BASIC HOURLY RATE AND $0.50 TO HEALTH AND WELFARE.
- M
- THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN.
- N
- THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
- O
- THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN
- P
- $0.27 DECREASE TO BASIC HOURLY RATE, $0.27 INCREASE TO HEALTH & WELFARE AND $0.14 INCREASE TO PENSION