GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SANTA CLARA COUNTY

DETERMINATION: STC-2018-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2018 04/30/2019* $42.700 A $9.950 $10.140 $3.000 B $0.800 $1.360 C 8 D $67.950 $90.800 E $90.800 E $113.650 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2018 12/31/2018** $47.800 A $9.950 $11.790 $0.000 F $1.510 $0.430 8 D $71.480 $95.380 $95.380 G $119.280 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2018 04/30/2019* $33.070 H $8.250 $11.040 $0.000 F $0.450 $0.000 8 I $52.810 $69.350 J $69.350 J $85.880 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 08/22/2018 12/31/2018** $47.950 A $10.150 $15.250 $0.000 K $0.630 $0.340 8 $74.320 $98.290 L $98.290 L $122.270 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 08/22/2018 12/31/2018** $23.950 A $10.150 $7.630 $0.000 K $0.050 $0.340 8 $42.120 $54.100 L $54.100 L $66.070 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER LESS THAN 3 YEARS 08/22/2018 12/31/2018** $19.150 A $10.150 $6.100 $0.000 K $0.050 $0.340 8 $35.790 $45.360 L $45.360 L $54.940 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 08/22/2018 12/31/2018** $15.310 A $10.150 $4.880 $0.000 K $0.050 $0.340 8 $30.730 $38.390 L $38.390 L $46.040 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 08/22/2018 12/31/2018** $17.230 A $10.150 $5.490 $0.000 K $0.050 $0.340 8 $33.260 $41.880 L $41.880 L $50.490 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2018 11/30/2018** $38.020 $10.550 $5.900 M $0.000 $1.100 $0.260 N 8 $57.160 $76.840 O $76.840 O $96.510 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2018 11/30/2018** $43.720 $10.550 $5.900 M $0.000 $1.100 $0.260 N 8 $63.060 $85.690 O $85.690 O $108.310 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 08/22/2018 05/31/2019* $65.520 P $13.980 $18.150 Q $0.000 $1.100 $0.570 R 8 $101.290 $135.030 S $135.030 S $168.770 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2018 05/31/2019* $75.350 P $13.980 $18.150 Q $0.000 $1.100 $0.620 R 8 $111.460 $150.270 S $150.270 S $189.070 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER T 08/22/2017 07/31/2018* $27.770 $10.700 $3.300 M $0.000 $0.000 $0.250 8 $42.850 $57.150 $57.150 $71.460 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - FOURTH SIX MONTHS T 08/22/2017 07/31/2018* $23.600 $10.700 $3.300 M $0.000 $0.000 $0.230 8 $38.540 $50.690 $50.690 $62.850 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - THIRD SIX MONTHS T 08/22/2017 07/31/2018* $20.830 $10.700 $3.300 M $0.000 $0.000 $0.210 8 $35.660 $46.390 $46.390 $57.120 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - SECOND SIX MONTHS T 08/22/2017 07/31/2018* $18.050 $10.700 $3.300 M $0.000 $0.000 $0.200 8 $32.790 $42.090 $42.090 $51.380 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - FIRST SIX MONTHS T 08/22/2017 07/31/2018* $16.660 $0.000 $0.000 M $0.000 $0.000 $0.190 8 $17.350 $25.930 $25.930 $34.510 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY U 02/22/2018 02/28/2019** $42.190 $13.880 $11.510 V $4.270 W $1.020 $0.210 8 $73.080 $94.170 X $94.170 Y $115.270 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN U 02/22/2018 02/28/2019** $39.100 $13.880 $11.510 V $4.270 W $1.020 $0.210 8 $69.990 $89.540 X $89.540 Y $109.090 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN U 02/22/2018 02/28/2019** $36.220 $13.880 $11.510 V $4.270 W $1.020 $0.210 8 $67.110 $85.220 X $85.220 Y $103.330 HolidaysScope of WorkTravel & Subsistence
#GLAZIER 02/22/2018 06/30/2018* $46.080 A $10.150 $17.390 Z $0.000 $0.550 $0.380 AA 8 $74.550 $97.590 AB $120.630 $120.630 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER AC 08/22/2018 07/31/2019* $34.250 AD $9.950 $4.860 $0.000 K $0.450 $0.830 8 $50.340 $67.460 AE $84.590 $84.590 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON AC 08/22/2018 07/31/2019* $47.030 AD $9.950 $16.040 $0.000 K $0.800 $1.090 8 $74.910 $98.430 AE $121.940 $121.940 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH AND SPRAY AF 08/22/2018 12/31/2018** $40.570 H $10.150 $13.120 V $0.000 K $0.560 $0.380 8 D $64.780 $85.070 $85.070 AG $105.350 HolidaysScope of WorkTravel & Subsistence
PAINTER: METALIZING AND THERMAL SPRAY AF 08/22/2018 12/31/2018** $42.570 H $10.150 $13.120 V $0.000 K $0.560 $0.380 8 D $66.780 $88.070 $88.070 AG $109.350 HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL PAINTER AH 08/22/2018 12/31/2018** $41.570 H $10.150 $13.120 V $0.000 K $0.560 $0.380 8 D $65.780 $86.570 $86.570 AG $107.350 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER AF 08/22/2018 12/31/2018** $41.070 H $10.150 $13.120 V $0.000 K $0.560 $0.380 8 D $65.280 $85.820 $85.820 AG $106.350 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS AF 08/22/2018 12/31/2018** $41.320 H $10.150 $13.120 V $0.000 K $0.560 $0.380 8 D $65.530 $86.190 $86.190 AG $106.850 HolidaysScope of WorkTravel & Subsistence
PAINTER: PAPERHANGER, WALLCOVERING, LEAD ABATEMENT AF 08/22/2018 12/31/2018** $41.570 H $10.150 $13.120 V $0.000 K $0.560 $0.380 8 D $65.780 $86.570 $86.570 AG $107.350 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 02/22/2018 06/30/2018* $45.110 AI $10.150 $16.030 $0.000 K $0.560 $0.560 8 $72.410 $94.970 $94.970 D $117.520 AG HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER CLEAN-UP AJ 02/22/2018 06/30/2018* $18.010 AK $10.150 $0.000 $0.000 $0.000 $0.000 8 $28.160 $37.170 $37.170 D $46.170 AG HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2018 12/31/2018** $34.860 AL $13.480 $13.550 $3.500 $1.150 $1.200 8 $67.740 $84.180 $84.180 AM $100.620 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER AN 08/22/2018 06/30/2019* $37.140 AO $8.250 $11.730 $0.000 K $0.450 $0.450 AP 8 $58.020 $74.640 AQ $74.640 AQ $91.250 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2018 06/30/2019* $27.100 $10.600 $3.000 AR $2.250 $0.450 $0.600 8 $44.000 $57.550 $57.550 D $71.100 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2018 06/30/2019* $27.100 $10.600 $3.000 AR $2.250 $0.450 $0.600 8 $44.000 $57.550 $57.550 D $71.100 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AS 08/22/2018 06/30/2019* $16.100 $10.600 $3.000 AR $2.250 $0.450 $0.600 8 $33.000 $41.050 $41.050 D $49.100 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AS 08/22/2018 06/30/2019* $16.100 $10.600 $3.000 AR $2.250 $0.450 $0.600 8 $33.000 $41.050 $41.050 D $49.100 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AT 08/22/2018 06/30/2019* $13.300 $10.600 $3.000 AR $2.250 $0.450 $0.600 8 $30.200 $36.850 $36.850 D $43.500 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AU 08/22/2018 06/30/2019* $13.300 $10.600 $0.000 AR $2.250 $0.450 $0.600 8 $27.200 $33.850 $33.850 D $40.500 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AU 08/22/2018 06/30/2019* $13.300 $10.600 $3.000 AR $2.250 $0.450 $0.600 8 $30.200 $36.850 $36.850 D $43.500 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2018 06/30/2019** $62.660 A $16.460 AV $23.420 AW $0.000 F $1.450 $0.900 AX 8 $104.890 $140.470 E $140.470 E $176.050 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 2) 08/22/2018 06/30/2019* $20.480 A $10.700 AR $0.500 AR $0.000 F $0.000 $0.250 AY 8 $31.930 $42.170 E $42.170 E $52.410 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 3) 08/22/2018 06/30/2019* $26.080 A $10.700 AR $0.500 AR $0.000 F $0.000 $0.250 AY 8 $37.530 $50.580 E $50.580 E $63.610 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 4) 08/22/2018 06/30/2019* $27.460 A $10.700 AR $0.500 AR $0.000 F $0.000 $0.250 AY 8 $38.910 $52.640 E $52.640 E $66.370 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 5) 08/22/2018 06/30/2019* $30.450 A $10.700 AR $2.250 AR $0.000 F $0.000 $0.250 AY 8 $43.650 $58.880 E $58.880 E $74.100 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SERVICE AND REPAIR 08/22/2018 06/30/2019** $62.660 A $16.460 AV $23.420 AW $0.000 F $1.450 $0.900 AX 8 $104.890 $140.470 $140.470 AZ $140.470 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SPRINKLER FITTER (FIRE PROTECTION AND FIRE CONTROL SYSTEMS) 08/22/2018 12/31/2018** $63.870 A $10.620 $18.400 $0.000 F $1.600 $0.550 8 $95.040 $126.970 $126.970 $158.910 HolidaysScope of WorkTravel & Subsistence
#ROOFER ROOFER, KETTLEMAN 08/22/2017 07/31/2018* $38.310 BA $9.660 $6.960 $3.250 $0.850 $0.640 8 $59.670 $78.170 BB $78.170 BC $96.670 HolidaysScope of WorkTravel & Subsistence
ROOFER HELPER 08/22/2017 07/31/2018* $34.610 BA $9.660 $6.960 $3.250 $0.850 $0.640 8 $55.970 $72.620 BB $72.620 BC $89.270 HolidaysScope of WorkTravel & Subsistence
ROOFER KETTLEMAN (2 KETTLES) 08/22/2017 07/31/2018* $40.310 BA $9.660 $6.960 $3.250 $0.850 $0.640 8 $61.670 $81.170 BB $81.170 BC $100.670 HolidaysScope of WorkTravel & Subsistence
ROOFER BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER 08/22/2017 07/31/2018* $40.310 BA $9.660 $6.960 $3.250 $0.850 $0.640 8 $61.670 $81.170 BB $81.170 BC $100.670 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2018 06/30/2019** $59.110 H $14.400 BD $28.690 BE $0.000 F $1.480 $0.710 8 $104.390 $137.230 J $137.230 J $170.070 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS 08/22/2018 06/30/2019** $51.870 H $14.400 BD $27.250 BE $0.000 F $1.480 $0.710 8 $95.710 $124.520 J $124.520 J $153.340 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2018 06/30/2019** $40.750 H $13.800 BF $15.280 BE $0.000 F $1.380 $0.710 8 $71.920 $93.540 BG $93.540 BG $115.170 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2018 06/30/2019** $36.700 H $13.800 BF $10.010 BE $0.000 F $1.380 $0.710 8 $62.600 $81.750 BG $81.750 BG $100.900 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2018 06/30/2019** $32.420 H $13.800 BF $4.750 BE $0.000 F $1.360 $0.710 8 $53.040 $69.760 J $69.760 J $86.480 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2018 06/30/2019** $37.940 H $13.800 BD $10.290 BE $0.000 F $1.360 $0.710 8 $64.100 $83.820 J $83.820 J $103.540 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 08/22/2018 06/30/2019* $39.930 H $14.380 AR $20.000 BH $0.000 F $0.320 BI $0.000 8 $74.630 $95.600 J $95.600 J $116.560 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER BJ 08/22/2018 06/30/2019* $36.180 BK $9.950 $5.740 $0.000 F $0.800 $0.920 8 $53.590 $69.440 J $69.440 J $85.290 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER BJ 08/22/2018 06/30/2019* $45.900 BK $9.950 $15.040 $0.000 F $0.800 $1.110 8 $72.800 $92.810 J $92.810 J $112.820 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2018 03/31/2019* $27.560 BL $9.380 $5.220 $1.000 $0.820 $1.000 8 $44.980 $58.760 $58.760 D $72.540 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 08/22/2018 03/31/2019* $33.440 BL $9.380 $5.840 $1.500 $0.820 $1.070 8 $52.050 $68.770 $68.770 D $85.490 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2018 03/31/2019* $45.270 BL $9.380 $7.070 $2.500 $1.170 $1.670 8 $67.060 $89.690 $89.690 D $112.330 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER 08/22/1998 12/31/1998* $12.700 $3.200 $0.780 $0.630 BM $0.000 $0.000 8 $17.310 $23.660 BN $23.660 BN $23.660 BN HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/1998 12/31/1998* $12.700 $3.200 $0.780 $0.630 BM $0.000 $0.000 8 $17.310 $23.660 BN $23.660 BN $23.660 BN HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 02/22/2018 03/31/2018* $11.000 $3.200 $0.780 $0.520 BO $0.000 $0.000 8 $15.500 $21.000 BN $21.000 BN $21.000 BN HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
IN THE EVENT A CREW ON A PROJECT IS PREVENTED FROM WORKING ON A REGULAR WEEK DAY DUE TO INCLEMENT WEATHER OR ACT OF GOD, THAT CREW WILL BE PERMITTED TO WORK ON THE FOLLOWING SATURDAY AT STRAIGHT TIME ON A VOLUNTARY BASIS.
J
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
K
INCLUDED IN BASIC HOURLY RATE.
L
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
M
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
N
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
O
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
P
INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
Q
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
R
INCLUDES AMOUNT EQUAL TO 0.5% OF THE HOURLY RATE FOR THE ADMINISTRATIVE MAINTENANCE FUND AND THE REMAINING AMOUNT IS FOR THE JOINT ELECTRICAL INDUSTRY FUND.
S
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS UP TO A MAXIMUM OF 10 HOURS IN ANY ONE WEEK OR THE FIRST 8 HOURS WORKED ON SATURDAY IF NO OVERTIME HAS BEEN WORKED DURING THE WEEK. IF OVERTIME IS WORKED MONDAY THROUGH FRIDAY, SUBTRACT THAT AMOUNT OF TIME FROM THE TIME ALLOWED AT TIME AND ONE HALF (1 1/2) ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
T
THE MATERIAL HANDLER MAY BE UTILIZED IN CONJUNCTION WITH BOTH INSIDE AND LINE PROJECTS. THE RATIO OF MATERIAL HANDLER TO JOURNEYMEN SHALL BE ONE (1) MATERIAL HANDLER TO THREE (3) JOURNEYMEN.
U
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
V
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
W
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
X
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
Y
RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
Z
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
AA
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
AB
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
AC
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
AD
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AE
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AF
EMPLOYEES SHALL BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. EMPLOYEES SHALL BE ENTITLED TO $1.00 PER HOUR ABOVE THE BASIC HOURLY RATE WHEN PERFORMING WORK FROM OR TO A SUSPENDED PLATFORM SUCH AS SAFESPAN, QUICKDECK OR COMPARABLE PLATFORM SYSTEMS ON BRIDGE AND OVERPASS TYPE WORK.
AG
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AH
EMPLOYEES SHALL BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. EMPLOYEES SHALL BE ENTITLED TO $1.00 PER HOUR ABOVE THE BASIC HOURLY RATE WHEN PERFORMING WORK FROM OR TO A SUSPENDED PLATFORM SUCH AS SAFESPAN, QUICKDECK OR COMPARABLE PLATFORM SYSTEMS ON BRIDGE AND OVERPASS TYPE WORK.
AI
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AJ
PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AK
INCLUDES AN AMOUNT FOR DUES CHECK OFF
AL
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECKOFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES WORKING ON AND BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE.
AM
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AN
ALL HOD CARRIERS WORKING ON THE HOSE SHALL RECEIVE $5.00 PER DAY OVER SCALE.
AO
INCLUDES AN AMOUNT FOR VACATION, DUES CHECK-OFF AND ORGANIZING DUES WHICH ARE NOT FACTORED INTO OVERTIME.
AP
AMOUNT IS FOR INDUSTRY PROMOTION FUND.
AQ
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AR
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AS
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AT
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AU
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
AV
INCLUDES AN AMOUNT FOR HEALTH AND WELFARE EXTENDED RESERVE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AW
INCLUDES AN AMOUNT FOR 401A-PART B PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AX
$0.50 TO SUPPLEMENTAL UNEMPLOYMENT.
AY
AMOUNT IS FOR CONTRACT ADMINISTRATION
AZ
SATURDAY MAY BE PAID AT STRAIGHT TIME IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY.
BA
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
BB
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
BC
IN THE EVENT THAT CONDITIONS ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK PREVENT EMPLOYEES FROM WORKING ON SCHEDULED WORK DURING SUCH WEEK, WORK MAY BE PERFORMED ON SATURDAY AT STRAIGHT TIME RATES OF PAY.
BD
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BE
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BF
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BG
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
BH
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
BI
INCLUDES $0.05 FOR SCHOLAR FUND.
BJ
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
BK
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
BL
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BM
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
BN
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
BO
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page