Skip to Main Content


This information is provided free of charge by the Department of Industrial Relations from its web site at www.dir.ca.gov. These regulations are for the convenience of the user and no representation or warranty is made that the information is current or accurate. See full disclaimer at https://www.dir.ca.gov/od_pub/disclaimer.html.
 
Subchapter 7. General Industry Safety Orders
Group 3. General Plant Equipment and Special Operations
Article 13. Agricultural Operations
Return to index
New query

§3454. Sheepshearing.


(a) Canvas or other fabric material used for floors shall be stretched tight and properly pegged at regular 4 foot intervals around the outer edge to prevent them from gathering or bunching. The floor shall be maintained tight at all times.

(b) Hobbles shall be installed one-third of the way down on each hanger arm. These hobbles shall be secured to the main hanger, and the leather thongs passed through an eyelet on the turn-out side of the shearing floor. On each end of the thongs there shall be a weight adequate enough to pull the hanger arm back to a neutral position in case the clippers are dropped or kicked free.

(c) The catch pen and turn-out pen shall be provided with proper gates or other barriers to prevent sheep from dashing across the shearing floor while shearers are at work.

NOTE: Authority cited: Section 142.3, Labor Code. Reference: Section 142.3, Labor Code.

HISTORY

1. New NOTE filed 5-15-85; effective thirtieth day thereafter (Register 85, No. 20).

Go BackGo Back to Article 13 Table of Contents