GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: LAKE COUNTY

DETERMINATION: LAK-2023-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE STRAIGHT-TIME TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2023 04/30/2024** $52.650 A $11.250 $13.980 $3.000 B $0.800 $2.220 C 8.0 D $83.900 $111.730 E $111.730 E $139.550 HolidaysScope of WorkTravel & Subsistence
#BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2023 06/30/2024** $58.720 A $11.250 $14.220 $0.000 F $1.660 $0.430 8.0 D $86.280 $115.640 G $115.640 H $145.000 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2023 06/30/2024** $40.140 I $10.100 $13.300 $0.000 F $0.450 $0.300 8.0 $64.290 $84.360 J $84.360 J $104.430 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 08/22/2023 12/31/2023** $56.350 A $11.050 $20.530 $0.000 K $1.050 $0.340 8.0 $89.320 $117.500 L $117.500 L $145.670 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2023 10/31/2023** $40.880 $12.800 $10.000 M $0.000 $1.100 $0.260 N 8.0 $66.470 $87.620 O $87.620 O $108.770 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2023 10/31/2023** $47.010 $12.800 $10.000 M $0.000 $1.100 $0.260 N 8.0 $72.820 $97.150 O $97.150 O $121.480 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: INSIDE WIREMAN 08/22/2023 05/31/2024* $56.920 A $15.030 $12.000 P $0.000 $1.420 $0.310 Q 8.0 $87.670 $117.130 R $117.130 R $146.590 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: CABLE SPLICER 08/22/2023 05/31/2024* $62.610 A $15.030 $12.000 P $0.000 $1.420 $0.310 Q 8.0 $93.560 $125.970 R $125.970 R $158.370 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: TUNNEL WIREMAN 08/22/2023 05/31/2024* $57.420 A $15.030 $12.000 P $0.000 $1.420 $0.310 Q 8.0 $88.190 $117.900 S $117.900 T $147.620 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: TUNNEL CABLE SPLICER 08/22/2023 05/31/2024* $63.110 A $15.030 $12.000 P $0.000 $1.420 $0.310 Q 8.0 $94.080 $126.740 S $126.740 T $159.400 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) U 02/22/2020 03/31/2020* $21.880 & $4.200 $4.100 $2.500 $0.000 $0.000 8.0 $32.680 $43.620 $43.620 $54.560 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) U 02/22/2020 03/31/2020* $15.640 & $4.200 $4.100 $2.500 $0.000 $0.000 8.0 $26.440 $34.260 $34.260 $42.080 HolidaysScope of WorkTravel & Subsistence
GLAZIER 02/22/2023 03/31/2023* $15.500 & $0.000 $0.000 $0.190 $0.000 $0.000 8.0 $15.690 $23.440 $23.440 $23.440 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER V 08/22/2023 07/31/2024* $41.180 W $11.250 $6.280 $0.000 K $0.450 $0.930 8.0 $60.090 $80.680 X $101.270 $101.270 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON V 08/22/2023 07/31/2024* $60.200 W $11.250 $15.880 $0.000 K $0.800 $1.280 8.0 $89.410 $119.510 X $149.610 $149.610 HolidaysScope of WorkTravel & Subsistence
#PAINTER Y 08/22/2023 12/31/2023** $47.370 I $11.050 $15.220 Z $0.000 K $1.010 $0.380 8.0 D $75.030 $98.720 AA $98.720 AA $122.400 HolidaysScope of WorkTravel & Subsistence
#PAINTER INDUSTRIAL PAINTER AB 08/22/2023 12/31/2023** $49.370 I $11.050 $15.220 Z $0.000 K $1.010 $0.380 8.0 D $77.030 $101.720 AA $101.720 AA $126.400 HolidaysScope of WorkTravel & Subsistence
#PAINTER BRIDGE PAINTER AC 08/22/2023 12/31/2023** $51.370 I $11.050 $15.220 Z $0.000 K $1.010 $0.380 8.0 D $79.030 $104.720 AA $104.720 AA $130.400 HolidaysScope of WorkTravel & Subsistence
#PAINTER: TAPER 08/22/2023 12/31/2023** $56.230 AD $11.050 $17.840 $0.000 K $1.050 $0.670 8.0 $86.840 $114.960 AE $114.960 AE $143.070 AF HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2023 06/30/2024** $47.540 AG $14.930 $18.990 $0.000 F $1.290 $1.340 8.0 $84.090 $104.710 AH $104.710 AI $125.320 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2023 06/30/2024** $39.770 $10.100 $15.180 $3.670 $0.500 $0.660 AJ 8.0 $69.880 $89.770 L $89.770 L $109.650 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER 08/22/2022 06/30/2023* $82.000 AK $18.660 $21.730 $0.000 F $3.600 $3.770 AL 8.0 $129.760 $170.760 AM $170.760 AN $211.760 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBING SERVICE AND REPAIR, LIGHT COMMERCIAL 08/22/2022 06/30/2023* $69.700 AK $17.620 $19.440 $0.000 F $2.340 $2.050 AL 8.0 $111.150 $146.000 AM $146.000 AN $180.850 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: REFRIGERATION FITTER (HVAC) 08/22/2022 06/30/2023* $82.000 AK $18.660 $21.730 $0.000 F $3.600 $3.770 AL 8.0 $129.760 $170.760 AM $170.760 AN $211.760 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: AIR CONDITIONING & REFRIGERATION/HVAC - SERVICE WORK 08/22/2022 06/30/2023* $82.000 AK $18.660 $21.730 $0.000 F $3.600 $3.770 AL 8.0 $129.760 $170.760 AM $170.760 AN $211.760 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: LANDSCAPE/IRRIGATION PIPEFITTER 08/22/2022 06/30/2023* $69.700 A $17.000 $13.960 AO $0.000 F $1.100 $0.890 8.0 $102.650 $137.500 $137.500 AP $172.350 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: UNDERGROUND/UTILITY PIPEFITTER 08/22/2022 06/30/2023* $69.700 A $17.000 $13.960 AO $0.000 F $1.100 $0.890 8.0 $102.650 $137.500 $137.500 AP $172.350 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 02/22/2023 12/31/2023** $44.360 $11.450 $15.420 AQ $0.000 $0.520 $0.250 8.0 $72.000 $94.180 $94.180 $116.360 HolidaysScope of WorkTravel & Subsistence
#ROOFER 08/22/2023 07/31/2024* $48.220 $11.800 $9.700 $4.250 $0.750 $0.700 8.0 $75.420 $99.530 L $99.530 AR $123.640 HolidaysScope of WorkTravel & Subsistence
#ROOFER BITUMASTIC, ENAMELER, PIPE WRAPPER, COAL TAR PITCH BUILD-UP 08/22/2023 07/31/2024* $50.220 $11.800 $9.700 $4.250 $0.750 $0.700 8.0 $77.420 $102.530 L $102.530 AR $127.640 HolidaysScope of WorkTravel & Subsistence
#ROOFER MASTIC WORKER, KETTLEMAN 08/22/2023 07/31/2024* $48.470 $11.800 $9.700 $4.250 $0.750 $0.700 8.0 $75.670 $99.910 L $99.910 AR $124.140 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2023 06/30/2024** $72.370 I $15.770 AS $33.540 AT $0.000 F $1.650 $0.710 8.0 $124.040 $164.190 R $164.190 R $204.330 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS 08/22/2023 06/30/2024** $62.460 I $15.770 AS $31.820 AT $0.000 F $1.650 $0.710 8.0 $112.410 $147.100 R $147.100 R $181.790 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2023 06/30/2024** $49.090 I $15.170 AU $17.250 AT $0.000 F $1.490 $0.710 8.0 $83.710 $109.510 AV $109.510 AV $135.300 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2023 06/30/2024** $44.730 I $15.170 AU $11.320 AT $0.000 F $1.490 $0.710 8.0 $73.420 $96.590 AV $96.590 AV $119.750 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2023 06/30/2024** $39.010 I $15.170 AU $5.530 AT $0.000 F $1.470 $0.710 8.0 $61.890 $82.010 R $82.010 R $102.120 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2023 06/30/2024** $45.850 I $15.170 AS $11.720 AT $0.000 F $1.470 $0.710 8.0 $74.920 $98.600 R $98.600 R $122.270 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER METAL DECK & SIDING 08/22/2023 06/30/2024** $49.230 I $15.750 AO $23.000 AW $0.000 F $0.320 AX $0.000 8.0 $88.300 $114.050 R $114.050 R $139.790 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AY 08/22/2023 06/30/2024** $43.900 AZ $11.250 $6.820 $0.000 F $0.800 $1.070 8.0 $63.840 $83.210 R $83.210 R $102.580 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AY 08/22/2023 06/30/2024** $59.060 AZ $11.250 $15.380 $0.000 F $0.800 $1.310 8.0 $87.800 $113.970 R $113.970 R $140.140 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2023 03/31/2024* $32.780 BA $11.210 $5.900 $1.000 $0.500 $1.310 8.0 D $52.700 $69.090 $69.090 BB $85.480 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER RED CIRCLED FINISHER 08/22/2023 03/31/2024* $35.690 BA $11.210 $6.680 $1.500 $0.500 $1.350 8.0 D $56.930 $74.780 $74.780 BB $92.620 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2023 03/31/2024** $51.980 BA $11.210 $8.520 $2.500 $0.750 $1.890 8.0 D $76.850 $102.840 $102.840 BB $128.830 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: DRILLER, PUMP REPAIRMAN 08/22/2007 01/31/2008* $20.170 $8.120 $3.690 $0.800 BC $0.000 $0.000 8.0 $32.780 $42.870 BD $42.870 BD $42.870 BD HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: PUMP INSTALLER 08/22/2007 01/31/2008* $17.860 $8.120 $3.690 $0.720 BE $0.000 $0.000 8.0 $30.390 $39.320 BD $39.320 BD $39.320 BD HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: HELPER 02/22/2023 03/31/2023* $15.500 $8.120 $3.690 $0.640 BF $0.000 $0.000 8.0 $27.950 $35.700 BD $35.700 BD $35.700 BD HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY COUNCIL.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
H
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
I
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
J
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
K
INCLUDED IN BASIC HOURLY RATE.
L
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
M
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
N
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
O
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
P
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
Q
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE FOR ADMINISTRATIVE MAINTENANCE FUND IS ADDED TO THE TOTAL HOURLY RATE AND IS FACTORED INTO THE OVERTIME HOURLY RATE.
R
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
S
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
T
RATE APPLIES TO THE FIRST 8 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
U
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
V
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
W
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
X
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
Y
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($2.00 PER HOUR), EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
Z
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
AA
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AB
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AC
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AD
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AE
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AF
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AG
INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME.EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE
AH
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AI
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AJ
INCLUDES AN AMOUNT FOR INDUSTRY STABILIZATION FUND.
AK
INCLUDES AN AMOUNT FOR VACATION/HOLIDAY.
AL
INCLUDES FUNDS FOR SUB/JURY DUTY, CRAFT, CONTRACT ADMINISTRATION/HIRING HALL, JURISDICTIONAL PROTECTION AND SCHOLARSHIP.
AM
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AN
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
AO
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AP
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AQ
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AR
APPLIES TO THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT CONDITIONS OVER WHICH THE INDIVIDUAL EMPLOYER HAS NO CONTROL (I.E., ADVERSE WEATHER, PROJECT DELAYS, LOGISTICAL PROBLEMS, GENERAL CONTRACTOR OR OWNER REQUIREMENTS, ETC.) ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK PREVENT EMPLOYEES FROM WORKING, THEN WORK IS TO BE PERFORMED ON SATURDAY, WHEN AVAILABLE, AT STRAIGHT TIME RATES.
AS
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AT
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AU
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AV
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AW
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AX
INCLUDES $0.05 FOR SCHOLAR FUND.
AY
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AZ
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
BA
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BB
RATE APPLIES TO THE FIRST 9 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
BC
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.35 AFTER 2 YEARS; $1.45 AFTER 5 YEARS; $1.60 AFTER 10 YEARS
BD
COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
BE
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.27 AFTER 2 YEARS; $1.37 AFTER 5 YEARS; $1.52 AFTER 10 YEARS.
BF
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.19 AFTER 2 YEARS; $1.29 AFTER 5 YEARS; $1.44 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page