GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: LOS ANGELES COUNTY

DETERMINATION: LOS-2019-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, STONEMASON, MARBLE MASON, CEMENT BLOCKLAYER, POINTER, CAULKER, CLEANER 08/22/2018 04/30/2019** $40.460 A $8.250 $8.020 $0.000 $0.980 B $0.450 8 C $58.160 $78.390 D $78.390 D $98.620 HolidaysScope of WorkTravel & Subsistence
#BRICKLAYER: MASON FINISHER 08/22/2018 04/30/2019* $28.320 A $8.250 $8.020 $0.000 $0.860 B $0.450 8 C $45.900 $60.060 D $60.060 D $74.220 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER E 08/22/2018 06/30/2019** $32.260 $7.320 $7.780 $4.350 F $0.650 $0.440 8 C $52.800 $68.930 $68.930 $85.060 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER: FORKLIFT OPERATOR 08/22/2018 06/30/2019** $32.710 $7.320 $7.780 $4.350 F $0.650 $0.440 8 C $53.250 $69.600 $69.600 $85.960 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, RESILIENT TILE LAYER 02/22/2019 04/30/2019* $35.350 G $5.330 $6.550 $2.050 $0.630 $0.280 8 $50.190 $67.860 $67.860 H $85.540 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, MATERIAL HANDLER I 02/22/2019 04/30/2019* $12.000 G $5.330 $2.390 $0.550 $0.630 $0.180 8 $21.080 $27.080 $27.080 J $33.080 HolidaysScope of WorkTravel & Subsistence
#DRYWALL FINISHER DRYWALL FINISHER K 02/22/2019 09/30/2019** $36.050 L $8.850 $6.630 $3.070 $0.670 $0.770 8 $56.040 $74.060 $74.060 M $92.090 HolidaysScope of WorkTravel & Subsistence
DRYWALL FINISHER DRYWALL FINISHER 02/22/2019 09/30/2019** $40.180 G $8.850 $6.630 $3.070 $0.670 $0.770 8 $60.170 $80.260 $80.260 M $100.350 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2019 11/30/2019* $36.070 $8.560 $5.120 N $0.000 $0.650 $0.250 O 8 $51.730 $70.310 P $70.310 P $88.880 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN, RADIO MONITOR TECHNICIAN 02/22/2019 06/30/2019* $45.200 $12.740 $14.570 Q $0.000 R $0.710 $0.500 8 $75.080 $98.350 P $98.350 P $121.630 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER-WELDER 02/22/2019 06/30/2019* $47.460 $12.740 $14.570 Q $0.000 R $0.710 $0.500 8 $77.400 $101.850 P $101.850 P $126.290 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL WIREMAN 02/22/2019 06/30/2019* $49.720 $12.740 $14.570 Q $0.000 R $0.710 $0.500 8 $79.730 $105.340 P $105.340 P $130.940 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL CABLE SPLICER 02/22/2019 06/30/2019* $52.210 $12.740 $14.570 Q $0.000 R $0.710 $0.500 8 $82.300 $109.180 P $109.180 P $136.070 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TRANSPORTATION SYSTEMS ELECTRICIAN 02/22/2019 06/30/2019* $45.250 $12.740 $14.520 Q $0.000 R $0.710 $0.500 8 $75.080 $98.380 P $98.380 P $121.680 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TRANSPORTATION SYSTEMS ELECTRICIAN (CABLE SPLICING, WELDING, AND NETA TESTING) 02/22/2019 06/30/2019* $47.510 $12.740 $14.520 Q $0.000 R $0.710 $0.500 8 $77.410 $101.870 P $101.870 P $126.340 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TRANSPORTATION SYSTEMS TECHNICIAN S 02/22/2019 06/30/2019* $33.940 $12.740 $14.520 Q $0.000 R $0.710 $0.500 8 $63.430 $80.910 P $80.910 P $98.390 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) T 02/22/2019 09/30/2019* $50.160 $11.450 $10.650 $4.620 F $1.100 $0.150 8 $78.130 $103.210 P $103.210 P $128.290 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN (018.167-034) T 02/22/2019 09/30/2019* $47.660 $11.450 $10.650 $4.450 F $1.100 $0.150 8 $75.460 $99.290 P $99.290 P $123.120 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) T 02/22/2019 09/30/2019* $47.080 $11.450 $10.650 $4.400 F $1.100 $0.150 8 $74.830 $98.370 P $98.370 P $121.910 HolidaysScope of WorkTravel & Subsistence
#GLAZIER 08/22/2018 05/31/2019** $44.200 U $7.500 V $15.310 $0.000 W $0.770 $0.710 8 $68.490 $89.590 X $89.590 X $110.690 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER 08/22/2018 05/31/2019** $32.430 Y $9.250 $3.120 $0.000 $0.890 $0.370 8 $46.060 $62.280 Z $62.280 AA $78.490 AB HolidaysScope of WorkTravel & Subsistence
#PAINTER INDUSTRIAL PAINTER AC 08/22/2018 06/30/2019** $32.520 L $8.850 $3.040 $2.850 $0.700 $0.910 8 $48.870 $65.130 AD $65.130 AD $65.130 AD HolidaysScope of WorkTravel & Subsistence
#PAINTER: PAINTER, LEAD ABATEMENT AC 08/22/2018 06/30/2019** $31.120 L $8.850 $3.040 $2.550 $0.600 $0.910 8 $47.070 $62.630 AD $62.630 AD $62.630 AD HolidaysScope of WorkTravel & Subsistence
PAINTER: REPAINT PAINTER, LEAD ABATEMENT AC 08/22/2018 06/30/2019** $27.590 L $8.850 $3.040 $2.430 $0.600 $0.910 8 $43.420 $57.220 AE $57.220 AE $57.220 AE HolidaysScope of WorkTravel & Subsistence
PAINTER: PAINTER, LEAD ABATEMENT AF 08/22/2018 06/30/2019** $26.680 L $8.850 $3.040 $2.410 $0.600 $0.910 8 $42.490 $55.830 AD $55.830 AD $55.830 AD HolidaysScope of WorkTravel & Subsistence
PAINTER: REPAINT PAINTER, LEAD ABATEMENT AF 08/22/2018 06/30/2019** $24.400 L $8.850 $3.040 $2.330 $0.600 $0.910 8 $40.130 $52.330 AE $52.330 AE $52.330 AE HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL REPAINT PAINTER AC 08/22/2018 06/30/2019** $28.840 L $8.850 $3.040 $2.710 $0.700 $0.910 8 $45.050 $59.470 AE $59.470 AE $59.470 AE HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2018 08/06/2019** $36.860 $9.380 $4.840 $5.850 AG $0.780 $1.040 8 AH $58.750 $77.180 AD $77.180 AI $95.610 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER AJ 02/22/2019 08/06/2019** $36.370 $7.320 $7.430 $5.150 AG $1.020 $0.960 8 $58.250 $76.430 AK $76.430 AL $94.620 HolidaysScope of WorkTravel & Subsistence
PLASTER TENDER PLASTER CLEAN-UP LABORER 02/22/2019 08/06/2019** $33.820 $7.320 $7.430 $5.150 AG $1.020 $0.960 8 $55.700 $72.610 AK $72.610 AL $89.520 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 08/22/2018 08/31/2019** $50.130 AM $8.910 $11.750 AN $0.000 AO $2.250 $1.260 AP 8 $74.300 $98.520 D $98.520 D $121.110 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SEWER AND STORM DRAIN PIPELAYER 08/22/2018 08/31/2019** $37.240 AM $8.800 $8.900 AN $0.000 AO $1.980 $1.260 AP 8 $58.180 $75.950 $75.950 AQ $93.110 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN AR 08/22/2018 08/31/2019** $18.490 AS $8.550 $0.380 $0.000 $1.110 $1.110 AP 8 $29.640 $38.030 $38.030 AQ $46.430 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE/IRRIGATION FITTER 08/22/2018 08/31/2019** $33.150 Y $8.910 $11.750 AN $0.000 AO $1.640 $1.060 AP 8 AQ $56.510 $73.080 $73.080 $88.310 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE/IRRIGATION TRADESMAN AT 08/22/2018 08/31/2019** $14.670 Y $3.000 $0.880 AN $0.000 $0.100 $0.860 AP 8 AQ $19.510 $26.850 $26.850 $34.180 HolidaysScope of WorkTravel & Subsistence
PLUMBER: REFRIGERATION SERVICE HVACR 02/22/2019 08/31/2019** $47.200 G $10.620 $9.340 AU $0.000 R $2.000 $0.600 AV 8 $69.760 $93.360 $93.360 AW $115.810 AB HolidaysScope of WorkTravel & Subsistence
PLUMBER: REFRIGERATION SERVICE TRADESMAN HVACR 02/22/2019 08/31/2019* $12.900 G $10.620 $1.900 $0.000 R $1.050 $0.480 AV 8 $26.950 $33.400 $33.400 AW $39.400 AB HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) AX 02/22/2019 03/31/2019* $39.730 $10.020 $12.010 AY $0.000 $0.520 $0.250 8 $62.530 $82.400 $82.400 $102.260 HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) AZ 02/22/2019 08/31/2019** $44.610 $9.970 $15.600 $0.000 R $1.550 $0.300 BA 8 $72.030 $94.330 BB $94.330 BB $116.640 HolidaysScope of WorkTravel & Subsistence
#ROOFER 08/22/2018 07/31/2019** $38.120 BC $8.310 $8.120 BD $0.000 BE $0.510 $0.630 BF 8 $55.690 $72.880 D $72.880 D $90.060 HolidaysScope of WorkTravel & Subsistence
ROOFER PITCH WORK 08/22/2018 07/31/2019** $39.870 BC $8.310 $8.120 BD $0.000 BE $0.510 $0.630 BF 8 $57.440 $75.500 D $75.500 D $93.560 HolidaysScope of WorkTravel & Subsistence
ROOFER PREPARER 08/22/2018 07/31/2019** $39.120 BC $8.310 $8.120 BD $0.000 BE $0.510 $0.630 BF 8 $56.690 $74.380 D $74.380 D $92.060 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER BG 08/22/2018 06/30/2019** $44.280 L $10.620 $17.040 BH $0.000 $0.820 $0.650 8 $73.410 $95.550 BI $95.550 BI $117.690 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SHEET METAL WORKER BJ 02/22/2019 06/30/2019** $33.880 G $10.620 $15.220 BK $0.000 $1.670 $0.350 8 C $61.740 $78.680 BL $78.680 BL $95.620 AB HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER 08/22/2018 08/31/2019* $31.250 G $8.970 $3.790 $0.000 R $0.650 $0.260 8 AQ $44.920 $60.540 Z $60.540 BM $76.170 AB HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER 08/22/2018 08/31/2019* $38.390 G $9.250 $3.970 $0.000 R $0.960 $0.260 8 AQ $52.830 $72.030 Z $72.030 BM $91.220 AB HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2018 05/31/2019** $27.230 Y $8.830 $2.150 $0.000 $0.820 $0.310 8 $39.340 $52.960 Z $52.960 AA $66.570 AB HolidaysScope of WorkTravel & Subsistence
#TILE LAYER 08/22/2018 05/31/2019** $39.060 Y $9.250 $6.970 $0.000 $1.000 $0.370 8 $56.650 $76.180 Z $76.180 AA $95.710 AB HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF AND CONTRACT COMPLIANCE.
B
INCLUDES AN AMOUNT FOR IMI TRAINING FUND.
C
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER, OR REASONS BEYOND THE CONTROL OF THE EMPLOYER.
D
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
E
THE RATIO OF BRICK TENDERS TO BRICKLAYERS SHALL BE AS FOLLOWS: ONE (1) BRICK TENDER TO NO MORE THAN THREE (3) BRICKLAYERS DURING THE INSTALLATION OF BLOCK ON A TYPICAL MASONRY PROJECT.
F
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
G
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
H
RATE APPLIES TO THE FIRST 12 HOURS WORKED ON SATURDAY, ALL OTHER TIME IS PAID AT DOUBLE TIME. SATURDAY MAY BE WORKED AT THE STRAIGHT-TIME HOURLY RATE FOR THE FIRST 8 HOURS IF INCLEMENT WEATHER FORCES A SYNTHETIC/ARTIFICIAL TURF PROJECT TO SHUT DOWN DURING THE REGULAR WORK WEEK (MONDAY THOUGH FRIDAY).
I
A MATERIAL HANDLER MAY BE UTILIZED IN RATIO OF ONE (1) MATERIAL HANDLER WITH ANY FIVE (5) JOURNEYMEN ON ANY GIVEN PROJECT.
J
RATE APPLIES TO THE FIRST 12 HOURS ON SATURDAY, ALL OTHER TIME IS PAID AT DOUBLE TIME.
K
RATE ONLY APPLIES TO WORK PERFORMED IN ANTELOPE VALLEY WHICH IS HIGHWAY 5, SOUTH ON U.S. 5 TO HIGHWAY N2; EAST ON HIGHWAY N2 TO PALMDALE BLVD TO HIGHWAY 14; SOUTH TO HIGHWAY 18; EAST TO HIGHWAY 395.
L
INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
M
RATE APPLIES TO FIRST 8 HOURS ONLY. DOUBLE TIME THEREAFTER. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
N
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
O
INCLUDES AN AMOUNT FOR THE NATIONAL LABOR-MANAGEMENT COOPERATION FUND AND THE ADMINISTRATIVE MAINTENANCE FUND.
P
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
Q
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
R
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
S
THE MAXIMUM ALLOWABLE RATIO IS ONE TRANSPORTATION SYSTEMS TECHNICIAN TO ONE JOURNEYMAN ON EACH JOB.
T
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
U
INCLUDES AMOUNT WITHHELD FOR DUES CHECKOFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES $2.00 OF VACATION THAT IS NOT FACTORED IN THE OVERTIME RATES.
V
INCLUDES AN AMOUNT PER HOUR WORKED OR PAID TO DISABILITY FUND.
W
INCLUDED IN STRAIGHT-TIME HOURLY RATE WHICH IS NOT FACTORED IN THE OVERTIME RATES.
X
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
Y
INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
Z
RATE APPLIES TO FIRST TWO DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE HOLIDAY OVERTIME HOURLY RATE.
AA
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON A SIXTH OR SEVENTH CONSECUTIVE DAY DURING ANY ONE CALENDAR WEEK UP TO 50 HOURS IN ANY ONE CALENDAR WEEK. ALL HOURS IN EXCESS OF 10 HOURS DAILY OR 50 HOURS WEEKLY ARE PAID AT THE HOLIDAY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AB
RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
AC
AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
AD
DOUBLE TIME SHALL BE PAID FOR ALL HOURS WORKED OVER 12 HOURS IN ANY ONE DAY.
AE
ON REPAINT WAGE WORK ANY 8 HOURS IN A 24 HOUR PERIOD MONDAY THROUGH SUNDAY SHALL BE THE WORK DAY AND ANY 40 HOURS IN A WEEK SHALL BE THE WORK WEEK, PROVIDED THAT THE 40 HOURS IS WORKED IN 5 CONSECUTIVE DAYS (LEGAL HOLIDAYS WILL NOT BE COUNTED IN THE 5 CONSECUTIVE DAYS). FOR ALL WORK UNDER THIS CRAFT/CLASSIFICATION DOUBLE TIME SHALL BE PAID FOR ALL HOURS WORKED OVER 12 HOURS IN ANY ONE DAY.
AF
RATE ONLY APPLIES TO WORK PERFORMED IN ANTELOPE VALLEY, WHICH IS HIGHWAY 5, SOUTH ON U.S. 5 TO HIGHWAY N2; EAST ON HIGHWAY N2 TO PALMDALE BLVD TO HIGHWAY 14; SOUTH TO HIGHWAY 18; EAST TO HIGHWAY 395. AN ADDITIONAL $0.25 IS ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
AG
INCLUDES AN AMOUNT PER HOUR WORKED OR PAID FOR SUPPLEMENTAL DUES.
AH
SATURDAY IN THE SAME WORKWEEK MAY BE WORKED AT THE STRAIGHT-TIME HOURLY RATE IF IT IS NOT POSSIBLE TO COMPLETE FORTY HOURS OF WORK MONDAY THROUGH FRIDAY WHEN THE JOB IS SHUT DOWN DUE TO INCLEMENT WEATHER OR SIMILAR ACT OF GOD, OR BEYOND THE CONTRACTOR'S CONTROL.
AI
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AJ
THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS: THERE SHALL BE A PLASTER TENDER ON THE JOBSITE WHENEVER THERE IS A PLASTERER PERFORMING WORK ON THE JOBSITE, EXCEPT ON SMALL PATCH WORK WHERE ONLY ONE PLASTERER IS PERFORMING WORK. FOR INSIDE BROWN COATINGS THERE SHALL BE 2 PLASTER TENDERS FOR UP TO EVERY 3 PLASTERERS. FOR INSIDE FINISH COATINGS THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 3 PLASTERERS. ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL OTHER WORK, THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 2 PLASTERERS.
AK
ALL WORK PERFORMED AFTER TWELVE (12) HOURS IN A DAY SHALL BE PAID AT THE SUNDAY/HOLIDAY RATE.
AL
RATE APPLIES TO THE FIRST EIGHT HOURS ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAY WORK MAY BE PAID AT THE STRAIGHT TIME RATE IF THE JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
AM
INCLUDES AN AMOUNT WITHHELD FOR ADMINISTRATIVE DUES WHICH IS NOT FACTORED INTO OVERTIME AND AN AMOUNT FOR VACATION WHICH IS FACTORED AT 1.5 TIMES FOR ALL OVERTIME.
AN
INCLUDES AMOUNT FOR NATIONAL PENSION AND RETIREE'S X-MAS FUND.
AO
AMOUNT INCLUDED IN BASIC HOURLY RATE AND FACTORED AT 1.5 TIMES FOR ALL OVERTIME.
AP
INCLUDES AN AMOUNT FOR THE P.I.P.E. LABOR MANAGEMENT COOPERATION COMMITTEE AND THE CONTRACTOR EDUCATION & DEVELOPMENT FUND.
AQ
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AR
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
AS
INCLUDES AN AMOUNT WITHHELD FOR ADMINISTRATIVE DUES WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AT
TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR APPRENTICE LANDSCAPE/IRRIGATION FITTER. THE 3RD AND 4TH MAY BE A TRADESMAN. THE 5TH MUST BE A LANDSCAPE/IRRIGATION FITTER AND THEREAFTER TRADESMEN WILL BE REFERRED ON A 50-50 BASIS, TO JOURNEYMAN OR APPRENTICE.
AU
INCLUDES AN AMOUNT FOR 401A PLAN.
AV
INCLUDES AN AMOUNT FOR THE P.I.P.E. LABOR MANAGEMENT COOPERATION COMMITTEE TRUST FUND AND FOR PROMOTION FUND.
AW
SATURDAY MAY BE PAID AT STRAIGHT TIME IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY.
AX
RATE APPLIES TO REMAINDER OF COUNTY.
AY
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AZ
RATE APPLIES TO LOS ANGELES CITY LIMITS AND TWENTY-FIVE (25) MILES BEYOND CITY LIMITS OF LOS ANGELES.
BA
AMOUNT IS FOR INDUSTRY PROMOTION FUND AND P.I.P.E. FUND.
BB
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
BC
INCLUDE AMOUNTS FOR DUES CHECK OFF AND VACATION/HOLIDAY, WHICH ARE NOT FACTORED INTO OVERTIME.
BD
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
BE
INCLUDED IN BASIC HOURLY RATE. VACATION IS NOT FACTORED INTO OVERTIME
BF
INCLUDE AMOUNTS FOR ADMINISTRATIVE FUND, COMPLIANCE FUND, INDUSTRY FUND, AND RESEARCH AND EDUCATION TRUST FUND.
BG
APPLIES TO THAT PORTION OF THE COUNTY SOUTH OF A STRAIGHT LINE DRAWN BETWEEN GORMAN AND BIG PINES.
BH
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BI
RATE APPLIES FOR THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY RATE. SATURDAYS IN THE SAME WORKWEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
BJ
APPLIES TO THAT PORTION OF THE COUNTY NORTH OF A STRAIGHT LINE DRAWN BETWEEN GORMAN AND BIG PINES INCLUDING THE CITIES OF LANCASTER AND PALMDALE.
BK
INCLUDES AMOUNTS FOR LOCAL PENSION, NATIONAL PENSION PLAN, 401(A) PLAN, RETIREE'S SUPPLEMENTAL HEALTH PLAN. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BL
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS ON SATURDAY AND SUNDAY. ALL OTHER OVERTIME HOURS IS AT DOUBLE TIME RATE.
BM
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON A SIXTH OR SEVENTH CONSECUTIVE DAY DURING ANY ONE CALENDAR WEEK UP TO 50 HOURS IN ANY ONE CALENDAR WEEK. ALL OTHER TIME IS PAID AT THE HOLIDAY RATE.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page