GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN BERNARDINO COUNTY

DETERMINATION: SBR-2017-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5 DATE OF NEXT INCREASE 6 AMOUNT OF INCREASE 6 INCREASE FOOTNOTE 6 DATE OF NEXT INCREASE 7 AMOUNT OF INCREASE 7 INCREASE FOOTNOTE 7 DATE OF NEXT INCREASE 8 AMOUNT OF INCREASE 8 INCREASE FOOTNOTE 8
CARPET, LINOLEUM, RESILIENT TILE LAYER - SECOND SHIFT 08/22/2017 04/30/2018** 05/01/2018 $1.500 A 01/01/2019 $1.500 A
CARPET, LINOLEUM, MATERIAL HANDLER - SECOND SHIFT B 08/22/2017 12/31/2017** 01/01/2018 $0.600 C
ELECTRICIAN: COMM & SYSTEM INSTALLER, SECOND SHIFT 02/22/2017 12/31/2017** 01/01/2018 $1.750 D 01/01/2019 $2.000 D
ELECTRICIAN: COMM & SYSTEM INSTALLER, THIRD SHIFT 02/22/2017 12/31/2017** 01/01/2018 $1.750 D 01/01/2019 $2.000 D
ELECTRICIAN: INSIDE WIREMAN - ZONE A, 2ND SHIFT E 08/22/2017 05/27/2018** 05/28/2018 $1.950 D 05/27/2019 $2.000 D
ELECTRICIAN: INSIDE WIREMAN - ZONE A, 3RD SHIFT E 08/22/2017 05/27/2018** 05/28/2018 $1.950 D 05/27/2019 $2.000 D
ELECTRICIAN: CABLE SPLICER - ZONE A, 2ND SHIFT E 08/22/2017 05/27/2018** 05/28/2018 $1.950 D 05/27/2019 $2.000 D
ELECTRICIAN: CABLE SPLICER - ZONE A, 3RD SHIFT E 08/22/2017 05/27/2018** 05/28/2018 $1.950 D 05/27/2019 $2.000 D
PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER (2ND SHIFT) 08/22/2017 08/31/2018** 09/01/2018 $2.160 D 09/01/2019 $2.010 D 09/01/2020 $2.010 D 09/01/2021 $2.260 D 09/01/2022 $2.260 D 09/01/2023 $2.350 D 09/01/2024 $2.500 D 09/01/2025 $2.500 D
PLUMBER: SEWER AND STORM DRAIN PIPELAYER (2ND SHIFT) 08/22/2017 08/31/2018** 09/01/2018 $2.160 D 09/01/2019 $2.010 D 09/01/2020 $2.010 D 09/01/2021 $2.260 D 09/01/2022 $2.260 D 09/01/2023 $2.350 D 09/01/2024 $2.500 D 09/01/2025 $2.500 D
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN (2ND SHIFT) F 08/22/2017 08/31/2018** 09/01/2018 $0.860 D 09/01/2019 $0.800 D 09/01/2020 $0.800 D 09/01/2021 $0.900 D 09/01/2022 $0.900 D 09/01/2023 $0.940 D 09/01/2024 $1.000 D 09/01/2025 $1.000 D
PLUMBER: SERVICE & REPAIR (PLUMBER/HVAC-FITTER) (2ND SHIFT) 08/22/2017 08/31/2018** 09/01/2018 $2.160 D 09/01/2019 $2.010 D 09/01/2020 $2.010 D 09/01/2021 $2.260 D 09/01/2022 $2.260 D 09/01/2023 $2.350 D 09/01/2024 $2.500 D 09/01/2025 $2.500 D
PLUMBER: LANDSCAPE/IRRIGATION FITTER SECOND SHIFT 08/22/2017 08/31/2018** 09/01/2018 $2.160 D 09/01/2019 $2.010 D 09/01/2020 $2.010 D 09/01/2021 $2.260 D 09/01/2022 $2.260 D 09/01/2023 $2.350 D 09/01/2024 $2.500 D 09/01/2025 $2.500 D
PLUMBER: LANDSCAPE/IRRIGATION TRADESMAN SECOND SHIFT G 08/22/2017 08/31/2018** 09/01/2018 $0.560 D 09/01/2019 $0.520 D 09/01/2020 $0.520 D 09/01/2021 $0.590 D 09/01/2022 $0.590 D 09/01/2023 $0.610 D 09/01/2024 $0.650 D 09/01/2025 $0.650 D

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
$1.50 TO THE BASIC HOURLY RATE.
B
A MATERIAL HANDLER MAY BE UTILIZED IN RATIO OF ONE (1) MATERIAL HANDLER WITH ANY FIVE (5) JOURNEYMEN ON ANY GIVEN PROJECT.
C
$0.60 ALLOCATED TO THE BASIC HOURLY RATE.
D
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
E
ZONE A IS DEFINED AS THE PORTION OF THE COUNTY 80 ROAD MILES FROM U.S. POST OFFICE, 455 W. ORANGE SHOW ROAD, SAN BERNARDINO. ZONE B IS DEFINED AS ANY WORK OUTSIDE OF ZONE A (80 MILE FREE ZONE) WHICH REQUIRES AN ADDITIONAL $12.00 PER HOUR FOR TRAVEL/SUBSISTENCE. PAY SHALL BE ON A SEPARATE CHECK.
F
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
G
TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR APPRENTICE LANDSCAPE/IRRIGATION FITTER. THE 3RD AND 4TH MAY BE A TRADESMAN. THE 5TH MUST BE A LANDSCAPE/IRRIGATION FITTER AND THEREAFTER TRADESMEN WILL BE REFERRED ON A 50-50 BASIS, TO JOURNEYMAN OR APPRENTICE.

Return to main page