GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
LOCALITY: MENDOCINO COUNTY
DETERMINATION: MEN-2016-2
CRAFT | CLASSIFICATION | CRAFT FOOTNOTE | ISSUE DATE | EXPIRATION DATE | DATE OF NEXT INCREASE 1 | AMOUNT OF INCREASE 1 | INCREASE FOOTNOTE 1 | DATE OF NEXT INCREASE 2 | AMOUNT OF INCREASE 2 | INCREASE FOOTNOTE 2 | DATE OF NEXT INCREASE 3 | AMOUNT OF INCREASE 3 | INCREASE FOOTNOTE 3 | DATE OF NEXT INCREASE 4 | AMOUNT OF INCREASE 4 | INCREASE FOOTNOTE 4 | DATE OF NEXT INCREASE 5 | AMOUNT OF INCREASE 5 | INCREASE FOOTNOTE 5 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
BRICKLAYER, BLOCKLAYER: | BRICKLAYER, BLOCKLAYER, STONEMASON | 08/22/2016 | 04/30/2017** | 05/01/2017 | $1.500 | A | 05/01/2018 | $1.750 | A | ||||||||||
BRICKLAYER, BLOCKLAYER: | POINTER, CLEANER, CAULKER, WATERPROOFER | 08/22/2016 | 06/30/2017** | 07/01/2017 | $1.850 | A | |||||||||||||
BRICK TENDER | 08/22/2016 | 06/30/2017** | 07/01/2017 | $1.000 | A | 07/01/2018 | $1.000 | A | 07/01/2019 | $1.200 | A | ||||||||
CARPET, LINOLEUM, | SOFT FLOOR LAYER | 02/22/2016 | 12/31/2016** | 01/01/2017 | $2.000 | A | 01/01/2018 | $2.000 | A | 01/01/2019 | $2.000 | A | |||||||
CARPET, LINOLEUM, | FLOOR COVERING HANDLER AFTER 3 YEARS | 02/22/2016 | 12/31/2016** | 01/01/2017 | $1.000 | A | 01/01/2018 | $1.000 | A | 01/01/2019 | $1.000 | A | |||||||
CARPET, LINOLEUM, | FLOOR COVERING HANDLER LESS THAN 3 YEARS | 02/22/2016 | 12/31/2016** | 01/01/2017 | $0.800 | A | 01/01/2018 | $0.800 | A | 01/01/2019 | $0.800 | A | |||||||
CARPET, LINOLEUM, | FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS | 02/22/2016 | 12/31/2016** | 01/01/2017 | $0.640 | A | 01/01/2018 | $0.640 | A | 01/01/2019 | $0.640 | A | |||||||
CARPET, LINOLEUM, | FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS | 02/22/2016 | 12/31/2016** | 01/01/2017 | $0.720 | A | 01/01/2018 | $0.720 | A | 01/01/2019 | $0.720 | A | |||||||
ELECTRICIAN: | COMM & SYSTEM INSTALLER | 02/22/2016 | 11/30/2016** | 12/01/2016 | $1.760 | A | |||||||||||||
ELECTRICIAN: | COMM & SYSTEM TECH. | 02/22/2016 | 11/30/2016** | 12/01/2016 | $2.000 | A | |||||||||||||
MARBLE FINISHER | B | 08/22/2016 | 01/31/2017** | 02/01/2017 | $0.050 | A | 08/01/2017 | $1.850 | A | 08/01/2018 | $2.200 | A | |||||||
MARBLE MASON | B | 08/22/2016 | 01/31/2017** | 02/01/2017 | $0.400 | A | 08/01/2017 | $3.000 | A | 08/01/2018 | $3.250 | A | |||||||
PAINTER: | BRUSH AND SPRAY | 02/22/2016 | 12/31/2016** | 01/01/2017 | $1.760 | C | |||||||||||||
PAINTER: | INDUSTRIAL PAINTER | 02/22/2016 | 12/31/2016** | 01/01/2017 | $1.760 | C | |||||||||||||
PAINTER: | SANDBLASTER, STEAM CLEANER, WATERBLASTER | 02/22/2016 | 12/31/2016** | 01/01/2017 | $1.760 | C | |||||||||||||
PAINTER: | EXOTIC MATERIALS | 02/22/2016 | 12/31/2016** | 01/01/2017 | $1.760 | C | |||||||||||||
PAINTER: | PAPERHANGER/WALLCOVERING | 02/22/2016 | 12/31/2016** | 01/01/2017 | $1.760 | C | |||||||||||||
PAINTER: | TAPER | 08/22/2016 | 12/31/2016** | 01/01/2017 | $2.050 | D | 01/01/2018 | $2.050 | D | ||||||||||
PLASTER TENDER | 08/22/2016 | 06/30/2017** | 07/01/2017 | $1.600 | A | 07/01/2018 | $1.650 | A | |||||||||||
PLUMBER: | FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) | 08/22/2016 | 12/31/2016** | 01/01/2017 | $0.550 | E | 04/01/2017 | $1.920 | F | 01/01/2018 | $0.700 | G | 04/01/2018 | $2.000 | H | 01/01/2019 | $0.550 | I | |
ROOFER | 08/22/2016 | 07/31/2017** | 08/01/2017 | $2.000 | J | 08/01/2018 | $2.000 | J | 08/01/2019 | $2.000 | K | ||||||||
ROOFER | BITUMASTIC, ENAMELER, PIPE WRAPPER, COAL TAR PITCH BUILD-UP | 08/22/2016 | 07/31/2017** | 08/01/2017 | $2.000 | J | 08/01/2018 | $2.000 | J | 08/01/2019 | $2.000 | K | |||||||
ROOFER | MASTIC WORKER, KETTLEMAN | 08/22/2016 | 07/31/2017** | 08/01/2017 | $2.000 | J | 08/01/2018 | $2.000 | J | 08/01/2019 | $2.000 | K | |||||||
SHEET METAL WORKER | 08/22/2016 | 07/02/2017** | 07/03/2017 | $3.500 | A | ||||||||||||||
SHEET METAL WORKER | TOTAL SHEET METAL CONTRACT OF $200000 OR LESS | 08/22/2016 | 07/02/2017** | 07/03/2017 | $3.000 | A | |||||||||||||
SHEET METAL WORKER | SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) | 08/22/2016 | 07/02/2017** | 07/03/2017 | $2.250 | A | |||||||||||||
SHEET METAL WORKER | SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) | 08/22/2016 | 07/02/2017** | 07/03/2017 | $1.950 | A | |||||||||||||
SHEET METAL WORKER | AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) | 08/22/2016 | 07/02/2017** | 07/03/2017 | $1.650 | A | |||||||||||||
SHEET METAL WORKER | AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) | 08/22/2016 | 07/02/2017** | 07/03/2017 | $2.000 | A | |||||||||||||
TERRAZZO FINISHER | L | 08/22/2016 | 06/30/2017** | 07/01/2017 | $1.000 | A | 07/01/2018 | $1.250 | A | ||||||||||
TERRAZZO WORKER | L | 08/22/2016 | 06/30/2017** | 07/01/2017 | $1.750 | A | 07/01/2018 | $2.000 | A | ||||||||||
TILE FINISHER | 08/22/2016 | 09/30/2016** | 10/01/2016 | $0.700 | M | ||||||||||||||
TILE FINISHER | RED CIRCLED FINISHER | 08/22/2016 | 09/30/2016** | 10/01/2016 | $0.700 | M | |||||||||||||
TILE SETTER | 08/22/2016 | 09/30/2016** | 10/01/2016 | $0.700 | M | 04/01/2017 | $3.250 | A | 04/01/2018 | $3.400 | A |
FOOTNOTES
- **
- THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
- A
- THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
- B
- EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
- C
- $0.01 TO TRAINING, $1.75 TO WAGES AND/OR FRINGES.
- D
- $0.48 TO PENSION AND $1.57 TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
- E
- $0.40 TO HEALTH AND WELFARE AND $0.15 TO PENSION.
- F
- $1.75 TO THE BASIC HOURLY RATE, $0.15 TO PENSION, AND $0.02 TO TRAINING.
- G
- $0.50 TO HEALTH AND WELFARE AND $0.20 TO PENSION.
- H
- $1.70 TO THE BASIC HOURLY RATE, $0.25 TO PENSION AND $0.05 TO TRAINING.
- I
- $0.35 TO HEALTH AND WELFARE AND $0.20 TO PENSION.
- J
- $0.25 TO H&W, $0.30 TO PENSION AND $1.45 TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
- K
- $0.55 TO H&W AND $1.45 TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
- L
- THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
- M
- $0.15 TO HEALTH & WELFARE AND $0.55 TO PENSION.